BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 11, 2025 at 8:00 PM

Updated April 12, 2025

Renovation of an educational facility in Pittsburg, Kansas. Completed plans call for the renovation of a 6,341-square-foot educational facility.

** As of march 3 ,2025 , this project has not yet been awarded. The project is expected to be awarded on March 10,2025.** carpet removal and VCT tile installation located at Pittsburg High School, 1978 West 4th St, Pittsburg, Kansas 66762. Remove approximately 6,341 square feet of existing carpeting and related base. Install the same quantities of VCT and base in the existing classrooms. Material Specifications: The VCT will be Armstrong Standard Excelon Imperial Texture #51904 Sterling. The adhesive will be Armstrong S-515 thin spread. The base will be 4 inch Tarkett TA4 Gateway. The transitions will be metal base tracks with the appropriate snap-in transition to match the base color. The installer will be responsible for all measurements and quantities of the listed materials. Preparation: Once the existing carpet is removed, the installer will remove any adhesive residue so that no ridges or puddles are evident and only a thin, smooth film remains. The floor will be patched as needed using a polymer-modified patch compound. All flooring material and adhesives must be at room temperature for a minimum of 48 hours before installation. The installer will verify that all VCT tiles of each color are from the same lot before installation. Installation: Spread adhesive and install VCT per Armstrong Flooring's specifications. Cleanup: The installer will be responsible for the cleanup and removal from the site of all existing carpet and related installation materials. Shelf stock: The Installer will supply USD 250 with 3 cases of Armstrong Standard Excelon Imperial Texture #51904 Sterling (from the same lot number as the installed tile). Project Time for Completion: The project may begin as early as May 26, 2025, and be finished no later than August 1, 2025

Bid Results

Educational

$21,400.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
88
Active Projects
51
Bidding Soon
553
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2025

May 26, 2025

Project location map

1978 W 4th St, Pittsburg, KS

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.