EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 4, 2025 at 7:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Normal, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

This project consists of approximately 35,000 square feet (SF) of Sidewalk Removal, approximately 40,000 SF of PCC Sidewalk construction, construction of ADA sidewalk ramps, sidewalk vertical displacement removal, driveway pavement reconstruction, storm sewer inlet adjustments and reconstruction along with all necessary items and incidentals required to complete this project in accordance with the . . Questions and interpretation during bidding. (a) If a Bidder finds a discrepancy or omission in the Bid Documents or is in doubt as to the meaning of any requirement or term, the Bidder must notify the Town at least five business days prior to the Bid Deadline. The failure of the Bidder to request clarification prior to submitting the bid waives the Bidder's right to claim any ambiguity or discrepancy in the documents. (b) All inquiries will be addressed either through a pre-bid conference or through an addendum. Town officials or employees are prohibited from discussing this bid except at the prebid conference. No discussions or answers other than through the pre-bid conference or through an addendum are binding on the Town. The Town of Normal reserves the right to reject any or all bids received.

Award

Sidewalks / Parking Lot

$738,237.00

Public - City

Paving, Site Work

36

5

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Fill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Retaining Walls, Planting

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
63
Bidding Soon
698
All Active Projects
315
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2025

March 24, 2025

img_map_placeholder

Multiple Locations, Normal, IL

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2025 Miscellaneous Sidewalk Improvements - 50/50 Sidewalk and ADA Ramps

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.