Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 27, 2025 at 7:00 PM

Updated March 4, 2025

Site work and paving for a civil project in Hinesville, Georgia. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The work to be performed consists of furnishing all labor and materials to complete the Roadway Drainage System Improvements. More specifically, the project will consist of installation of subsurface drainage system along the existing roadways; Christopher Drive, Barry McCaffery Blvd and Forest Street. No bids may be withdrawn for a period of sixty (60) days after the closing time schedule for receipt of bids. The M/WBE goal for this project is 10% MBE and 3% WBE, for a total M/WBE participation of 13%. All M/WBE documents must be submitted in a separate sealed envelope, otherwise bid may be rejected. The Owner reserves the right to accept or reject any or all bids and to waive informalities. Award of the contract, if it is awarded, will be to the lowest responsible bidder. Doc Notes: Plans, Specifications, and Contract documents are open to public inspection at the Hinesville City Hall, 115 East ML King Jr. Drive, Hinesville, and Simonton Engineering, LLC., 1050 Parkside Commons, Suite 101, Greensboro, Georgia 30642.

Post-Bid

Roads / Highways

$100,000.00

Public - City

Paving, Site Work

6

10

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
117
Active Projects
55
Bidding Soon
611
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 26, 2025

March 28, 2025

Project location map

Multiple Locations, Hinesville, GA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed