BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 25, 2025 at 8:00 PM

Updated April 26, 2025

Site work and paving for a mixed-use development in Kingston, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

A. The Contractor shall furnish all the labor, material and construction equipment and perform all the work for the construction of the Utilities as shown on the Drawings and described in the specifications prepared by Spicer Group, Inc. Contractor shall be responsible for the entire work until completed and accepted by the Owner. B. The Owner will obtain easements and rights-of-way needed for construction, as shown on the plans. Additional temporary easements beyond what is shown shall be the responsibility of the Contractor. Estimates : – $140,000 Question Deadline 02/25/2025 Questions received less than seven days prior to the date for opening of Bids may not be answered. Description: The Project consists of constructing: Hydroexcavation of 168 water services. 168 Each Hydroexcavation, 0' to 7' Deep 30 Hours Additional Hydroexcavation over 7' Deep Including Additional Sand Backfill 275 Sq. Ft. HMA Driveway/Pavement Repair 1175 Sq. Ft. Concrete Sidewalk Repair 350 Sq. Ft. Concrete Driveway/Pavement Repair 350 Sq. Ft. Gravel Driveway Repair 1 LS Cleanup 1 LS Traffic Control Est. Completion Date: Aug. 30, 2025 City: Kingston County: Tuscola State/Province: MI

Bid Results

Water / Sewer

$75,460.00

Public - City

Paving, Site Work

7

13

2

7

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
226
Active Projects
33
Bidding Soon
1,593
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 4, 2025

April 3, 2025

Project location map

Multiple Locations, Kingston, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.