BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 13, 2025 at 7:00 PM

Updated February 14, 2025

This is a service / maintenance or supply contract in Wilson, New York. Contact the soliciting agency for additional information.

We wanted to reach out regarding the Village of Wilson's Request for Proposals for planning services to develop a Comprehensive Revitalization Strategy. This initiative, funded by the New York Main Street program, aims to strengthen the long-term resiliency of the downtown business district through community engagement, market analysis, streetscape recommendations, and façade improvements. If this project is of interest, we'd love to discuss further. Please let us know if you'd like more details or have any questions. Service-Disabled Veteran-Owned Set Aside: No Contract term: 1 year The Village of Wilson was awarded a $50,000 CDBG Planning grant to complete an estimated $53,000 Village wide Water Asset Management Plan. The plan will evaluate and document the condition of the Village 's water system, identify needed water system improvements, and provide an implementation strategy to address the needs, including grant resources, to reduce Village cost burdens. Scope of Work The proposed scope for the study is as follows: Task 1: Inventory and assessment of the current system (6 months): a. Inventory the entire system in tanks, filtration plant, distribution lines, transmission lines, hydrants, pump stations, and equipment b. Input data for each component into an asset management software platform including asset name, useful life, age, condition, remaining useful life, service history c. Input location and associated data into a geographic information system that is linked to the asset management platform d. Hold first public meeting e. Interview key stakeholders Task 2: Determine the level of service (LOS) for each component (2 months) a. Define LOS based on regulatory requirements and customer service expectations b. Assess the performance of the system and its components related to the required LOS Task 3: Prioritize assets and establish reserve needs (2 months): a. Prioritize based on: i. Expected LOS and performance ii. How critical the component is to system performance, regulations, and customer needs b. Estimate years until failure (lifecycle) c. Estimate cost to repair, rehabilitate, or replace d. Based on 3b & 3c - established required annual reserve for each component Task 4: Prepare an implementation and funding plan & final report (2 months): a. Implementation and strategy for improvements will incorporate output of asset management platform and modifications of water system staff. b. Prepare a multi-year funding strategy including reserves, potential rate adjustments, and grant funding. Funding will include CDBG Infrastructure funding, EFC Infrastructure funding and federal funding through EPA. The grant funding strategy will also include dates to complete associated c. Provide a separate GIS layer for proposed improvement timeframes d. Identify which projects would benefit low-to-moderate income people by overlaying the GIS system improvement date with the HUD low-to-moderate income GIS layer for the Village, census tracts and block groups. e. Hold final public meeting to provide opportunities for public input on recommendations and findings f. Assist Village with annual and semi-annual reporting Deadline for Questions: February 21, 2025 Please submit requests for clarifications in writing via email to VOW@VillageofWilson.org Award Date: March 10, 2025 Project Duration: The project must be completed by January 26, 2026. The method of Contractor Selection has not been Determined at this time.

Conceptual

Municipal

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
518
Active Projects
293
Bidding Soon
4,863
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 5, 2025

Project location map

Multiple Locations, Wilson, NY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.