BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 24, 2025 at 8:00 PM

Updated September 25, 2025

Site work for a water / sewer project in Killeen, Texas. Design plans call for site work for a water / sewer project.

24-inch water transmission main along Chaparral Road and Highway 195 between the Chaparral Pump Station and Stagecoach Road. This transmission main is needed to convey water from the Chaparral Pump Station into the Upper Pressure Plan. It also provides transmission capacity to and from the proposed Highway 195 Tank. This is Project 2W in the 2019 Water and Wastewater Master Plan. Although this project was part of the FY 2022 CIP, additional funding is necessary to offset funding moved from this project and to offset construction cost increases This project is included in the city's 2025-2029 Capital Improvement Program (CIP). As of September 24, 2025, the project is in design. The construction contract will be in the city council meeting for approval on October 21, 2025. The firm construction timeline has not been released. Funding has been allocated. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Design

Water / Sewer

$9,981,018.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 3, 2025

Project location map

TX-195, Killeen, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.