BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 2, 2025 at 8:00 PM

Updated June 3, 2025

Site work for a water / sewer project in Everett, Washington. Conceptual plans call for site work for a water / sewer project.

Reservoir 3 is a critical drinking water reservoir in Everett's water system and serves City of Everett water customers south of 41st Street as well as the Alderwood, Silver Lake and Mukilteo water districts. This 20 million gallon (MG) in-ground concrete open reservoir was originally constructed 100 years ago. A cover was built over the reservoir approximately 30 years ago. The City of Everett is replacing Reservoir 3 because it is structurally deficient, and its cover is rapidly deteriorating. The new Reservoir 3 will be designed and constructed according to current seismic standards and codes to withstand a significant seismic event. Phase 1 of the project will include construction of a new 8 MG reservoir while the existing 20 MG reservoir remains in service. Phase 2 will include the demolition of the existing 20 MG reservoir and construction of a 12 MG reservoir at the same location. The new 8 MG reservoir will have a diameter of 220 feet and rise approximately 21 feet above the ground. The 12 MG reservoir will have a diameter of 268 feet and will rise approximately 22 feet above the ground. Both reservoirs will be cylindrical. As of June 2, 2025, this project is included in the City of Everett's - Fiscal Year 2025-2029 Capital Improvement Program. Further information regarding a design firm and timeline for construction. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$55,812,977.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
202
Active Projects
91
Bidding Soon
1,953
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.