EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 11, 2025 at 8:00 PM

Updated October 1, 2024

Renovation of a fitness / recreation center in Providence, Rhode Island. Completed plans call for the renovation of a fitness / recreation center.

Work Included Provide labor, materials, and equipment necessary to complete the work of this Section, including, but not limited to, the following 1. Complete main power distribution system including main distribution switchboard with main service disconnect switch, power distribution section, over current protective devices, all provisions for metering including utility metering, surge protection, and secondary feeders from utility transformer to main service disconnect. 2. Partial building secondary power distribution system with lighting and power distribution panelboards, and all feeders. 3. Main grounding system as required by Article 250 of the National Electrical Code. 4. Complete raceway system with conduits, conduit fittings, outlet boxes, wire ways, hangers, supports, and all incidental items as required for a complete installation. Raceway systems installed exposed in all finished areas shall be specifically designed for the application. 5. All shown wiring devices including duplex receptacles and special power outlets. Provide cover plates for all wiring devices. 6. Vendor services, testing and training. 7. All devices and products under this section are to meet the voltage requirements available on site. It the Electrical Contractor's responsibility to ensure this. Deadline for questions submissions: Friday, February 28, 2025 at 12:00pm Reference Number : 0000376166 Davey Lopes Recreation Center Generator and Main Switchgear Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % Please direct questions relative to the specifications outlined (beginning on page 13) to the issuing department's subject matter expert: o Name: Ben Lobaugh o Title: Senior Capital Improvements Project Manager o Email Address: blobaugh@providenceri.gov Please direct questions related to the bidding process, how to fill out forms, and how to submit a bid (Pages 1-6) to the Purchasing Department. o Email: purchasing@providenceri.gov Please use the subject line "Solicitation Question" Question Deadline 02/28/2025 at 12:00 PM ET Questions are submitted online : No . Please direct questions relative to the Minority and Women's Business Enterprise Program and the corresponding forms (Pages 14-15) to the MBE/WBE Outreach Director for the City of Providence, Grace Diaz o Email: gdiaz@providenceri.gov . ** Bid date info : Bidders must submit 2 copies of their bid in sealed envelopes or packages labeled with the captioned Item Description and the City Department to which the solicitation and bid are related and must include the company name and address on the envelope as well. (On page 1). The bid envelope and information relative to the bid must be addressed to: Board of Contract and Supply Department of the City Clerk - City Hall, Room 311 25 Dorrance Street Providence, RI 02903

Post-Bid

Fitness / Rec Centers

$15,000.00

Public - City

Renovation

19

25

2

5

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Closeout Submittals, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Ceilings, Painting and Coating, Painting
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Switchboards and Panelboards, Switchboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Earth Moving, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Planting
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
359
Active Projects
229
Bidding Soon
3,149
All Active Projects
1,417
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 10, 2025

April 9, 2025

img_map_placeholder

227 Dudley St, Providence, RI

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Davey Lopes Recreation Center Generator and Main Switchgear

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.