BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 14, 2025 at 8:00 PM

Updated April 15, 2025

Renovation of a mixed-use development in Hillsboro, Illinois. Completed plans call for the renovation of a educational facility; and pipeline.

SCOPE OF WORK: BASE BID: Work includes abandoning of existing boilers, demolition of existing exterior boiler stack and removal of existing hydronic piping at existing boilers, as well as hydronic piping to reconnect existing loop to piping roughed-in as part of a separate new construction project. Work also includes split system equipment to provide cooling in the kitchen and roof top units to provide cooling in classrooms and library. Architectural, roofing and electrical work are commensurate with the HVAC scope of work. ALTERNATE BID #1: Work includes the demolition and removal of existing boilers. Contractor will be responsible for ordering equipment and all materials immediately after contract execution and shop drawing approvals, regardless of the first day available for construction. Contractor will be responsible for storing and insuring equipment and materials until the first day available for construction (approximately June 1, 2025). See Section 01 20 00 for additional information. Bidders will be required to provide bid security of a sum no less than 10 percent of the bid sum. The bid security shall be either certified check, cashier's check, bank money order or bid bond issued by surety licensed to conduct business in the State of Illinois. Hereinafter this bid security shall be referred to as the bid bond. Submit two copies of your bid on the bid form provided. Bidders may supplement this form as appropriate. Equipment providers to submit two copies of pricing break down on company letterhead, acknowledging any issued addenda, signed by authorized officer of company and must include all submittals indicated in the mechanical specifications. Your bid or equipment pricing will be required to be submitted under a condition of irrevocability for a period of 45 days after submission. The owner reserves the right to accept or reject any or all bids or any part thereof, to waive any informality in bidding, and to accept bids deemed most favorable to the owner. Question Deadline 02/27/2025 Awarded HVAC subcontractor: Hillers Sheet Metal, bid value is undisclosed

Award

Educational

$154,000.00

Public - City

Renovation

13

13

10

5

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
184
Active Projects
92
Bidding Soon
1,377
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 10, 2025

June 1, 2025

Project location map

522 E Tremont St, Hillsboro, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.