BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 20, 2025 at 8:00 PM

Updated March 21, 2025

Site work and paving for a mixed-use development in Glen Ellyn, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of March 20, 2025, this project has not yet been awarded. The project is expected to be awarded on 4/14. This Work consists of furnishing all labor, materials, tools, equipment, and incidentals necessary to restore Village right-of-way following utility repairs, which may include PCC curb and gutter, sidewalk, and/or driveway removal and replacement; full depth concrete patches; and/or HMA pavement patches. The Village's Utility Division makes approximately 15-20 utility repairs a year that require restoration. The Village anticipates that a maximum of three mobilizations will be required to complete restoration of these repair locations. The Village will provide the Contractor with up to three lists of 5-7 repairs each. Repairs shall commence within 14 calendar days of the Village's initial notice to the Contractor and shall be completed within 15 working days of the Contractor's mobilization. Exceptionsto this timeline will be made for repairs requiring State or County Permits. The contract season is weather dependent, but is expected to run from April through November. The amount of work under this contract will be subject to the actual number of utility pavement patch repairs required and the availability of funds for this work.. All questions about the meaning or intent of the Contract Documents are to be directed to Owner. Interpretations or clarifications considered necessary by Owner in response to such questions will be issued by Addenda emailed to all parties recorded by the Engineer as having received the Bidding Documents. Questions received less than seven days prior to the date for opening of Bids may not be answered. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or classifications will be without legal effect The Village makes approximately 15-20 utility repairs a year that require restoration. The Village will provide the Contractor with a list of approximately 5 repairs at a time that will need to be repaired withing 14 days of notice. The Village expects that a maximum of three mobilizations will be required to complete this work. The contract season is weather dependent, but expected to run from April through November. The amount of work under this contract will be subject to the actual number of utility pavement patch repairs required and the availability of funds for this work.

Bid Results

Water / Sewer

$58,340.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
455
Active Projects
245
Bidding Soon
3,334
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 26, 2025

March 28, 2025

Project location map

Multiple Locations, Glen Ellyn, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.