BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 18, 2025 at 7:00 PM

Updated February 20, 2025

Site work and new construction of a playground / park / athletic field in McArthur, Ohio. Conceptual plans call for the construction of a playground / park / athletic field; and for site work for a playground / park / athletic field.

Lake Hope Restroom and Shelter house Submit all questions regarding this RFQ in writing to engineering@dnr.ohio.go Lake Hope State Park and the entire 2,983-acre park that lies within the Zaleski State Forest in the valley of Big Sandy Run. The park's heavily forested region is marked by steep gorges and narrow ridges with remnants of abandoned mining and iron-producing industries. Lake Hope Forest Park was first created in 1937 by the Division of Forestry. The lands became Lake Hope State Park in 1949 when the Ohio Department of Natural Resources was created. The park surrounds the lake and boasts a wooded family campground, nature center, and a variety of year-round cabins for families and gatherings of all sizes, including a large group cabin. The park also includes a dining lodge with gift shop and gathering spaces, as well as a boat rental and concessions building. ODNR is seeking professional design services for the design and construction administration of a picturesque shelterhouse and restroom just off State Route 278 at the location of the former park office. The design team will work with the ODNR staff to determine the appropriate size and details of the shelter-house and restroom, as well as layout the areas surrounding the new shelterhouse making the area ADA accessible, including potential connections to a small courtesy boat dock at the lake shore. ODNR has previously conducted professional design services for a preliminary design of a shelter-house. The selected A/E team will need to include a restroom and associated utility services in the final design. These preliminary design documents will be shared only with the shortlisted firms. Construction Cost: 1,228,000 Construction Notice to Proceed: 05 / 27 Substantial Completion of all Work : 05 / 28 The method of Contractor Selection has not been Determined at this time.

Conceptual

Playgrounds / Parks / Athletic Fields

$1,228,000.00

Public - State/Provincial

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
178
Active Projects
104
Bidding Soon
1,808
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 3, 2027

Project location map

27331 OH-278, McArthur, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.