Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 18, 2025 at 7:00 PM
Updated February 20, 2025
Site work and new construction of a playground / park / athletic field in McArthur, Ohio. Conceptual plans call for the construction of a playground / park / athletic field; and for site work for a playground / park / athletic field.
Lake Hope Restroom and Shelter house Submit all questions regarding this RFQ in writing to engineering@dnr.ohio.go Lake Hope State Park and the entire 2,983-acre park that lies within the Zaleski State Forest in the valley of Big Sandy Run. The park's heavily forested region is marked by steep gorges and narrow ridges with remnants of abandoned mining and iron-producing industries. Lake Hope Forest Park was first created in 1937 by the Division of Forestry. The lands became Lake Hope State Park in 1949 when the Ohio Department of Natural Resources was created. The park surrounds the lake and boasts a wooded family campground, nature center, and a variety of year-round cabins for families and gatherings of all sizes, including a large group cabin. The park also includes a dining lodge with gift shop and gathering spaces, as well as a boat rental and concessions building. ODNR is seeking professional design services for the design and construction administration of a picturesque shelterhouse and restroom just off State Route 278 at the location of the former park office. The design team will work with the ODNR staff to determine the appropriate size and details of the shelter-house and restroom, as well as layout the areas surrounding the new shelterhouse making the area ADA accessible, including potential connections to a small courtesy boat dock at the lake shore. ODNR has previously conducted professional design services for a preliminary design of a shelter-house. The selected A/E team will need to include a restroom and associated utility services in the final design. These preliminary design documents will be shared only with the shortlisted firms. Construction Cost: 1,228,000 Construction Notice to Proceed: 05 / 27 Substantial Completion of all Work : 05 / 28 The method of Contractor Selection has not been Determined at this time.
Conceptual
Playgrounds / Parks / Athletic Fields
$1,228,000.00
Public - State/Provincial
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 3, 2027
27331 OH-278, McArthur, OH
Related To This Project
McArthur, OH
Bid Date: Apr 01 2025
McArthur, OH
Bid Date: Aug 20 2025
McArthur, OH
--
McArthur, OH
Bid Date: Feb 03 2025
McArthur, OH
--
McArthur, OH
--
McArthur, OH
Bid Date: Oct 24 2024
McArthur, OH
Bid Date: Oct 17 2024
McArthur, OH
Bid Date: Jun 04 2024
McArthur, OH
Bid Date: Jun 06 2024
McArthur, OH
Bid Date: May 10 2024
McArthur, OH
Bid Date: Mar 17 2022
McArthur, OH
Bid Date: Jun 06 2023
McArthur, OH
Bid Date: Apr 28 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
