Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 1, 2025 at 8:00 PM
Updated August 2, 2025
Site work and paving for a sidewalk / parking lot in St. Petersburg, Florida. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
Summary Removal of an access road along the frontage of Rutland Plaza on 62nd Avenue North in St. Petersburg. Project will include reconstruction of existing asphalt driveways and the the addition of sidewalks and greenspace along the removed sections of roadway. 1.2. Contact Information Gabriella DiPiazza Procurement Analyst 1 4th Street N, 5th Floor St. Petersburg, FL 33701 Email: gabriella.dipiazza@stpete.org Phone: (727) 893-4248 Department: Engineering Standard for Award The City will award to one vendor by written notice to the lowest responsible and responsive Vendor. Bid Evaluation Bids will be unconditionally accepted without alteration or correction unless the Procurement Director permits the correction or withdrawal of inadvertently erroneous bids. Bids will be evaluated based on the requirements and specifications set forth in the scope. Submittal Requirements The original bid bond must be received prior to the bid closing date and time. Project Superintendent Provide the name of the project Superintendent proposed to be assigned to this project and attach his or her experience profile. Small Business Enterprise (SBE) SBE Goal: 17% Scope of Work 4.1. Scope of Work The essential portions of the proposed Work for the Project are summarized as follows: Converting the majority of the existing paved Marginal Access Road along the frontage of Rutland Plaza to greenspace and reconstructing the asphalt pavement section along the frontage of McDonalds, Bank of America, and Checkers to maintain circulation for these businesses. Three of four existing accesses to development from 62nd Avenue North and Dr. MLK Jr Street North to Rutland Plaza will remain and the pavement will be reconstructed. Sidewalk will be constructed to 6-foot width to align with Complete Streets policy for 62nd Avenue North. 4.2. Minimum Qualifications The Bidder is hereby advised that the City will only accept bids from qualified Contractors who have successfully completed a minimum of three (3) projects in the five (5) years preceding the advertisement for this Solicitation, and whose project superintendent has also successfully completed a minimum of three (3) projects in the five (5) years preceding the advertisement for this Solicitation, in which each of the projects meet or exceed the following qualification requirements: SBE Goal: 17% Two (2) projects must include: Asphalt pavement construction Concrete pavement construction One (1) project must include: Construction of similar size and scope for a government agency Each of the three (3) projects must have a construction and/or renovation value in excess of $250,000 Have the ability to obtain the minimum insurance requirements set for in the agreement. Bidder must be able to obtain a Public Construction Bond for the Project upon award. 4.3. Maximum Contract Completion Time Contractor shall commence the Work within ten (10) calendar days after the City issues the Notice to Proceed. After issuance of the Notice to Proceed, the Contractor shall: Reach Substantial Completion of all Work within one-hundred and eighty (180) calendar days, and Reach Final Completion within thirty (30) calendar days after the City's delivery of the punch list. 4.4. City's Responsibilties At a minimum, City shall provide and meet the following responsibilities: City shall provide a point of contact (City Project Manager) to administer the Agreement. City Project Manager shall assist with planning, strategy, and objectives prior to performance of the Work. City Project Manager shall promptly respond to issues and inquiries so as not to hinder the progress, completion, or compensation for the Work. Deadline for Questions: February 27, 2025, 12:00pm Deadline for Question Response: March 3, 2025, 12:00pm
Award
Sidewalks / Parking Lot
$706,800.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 13, 2025
May 12, 2025
62nd Ave N, St. Petersburg, FL
Related To This Project
St. Petersburg, FL
Bid Date: May 01 2025
St. Petersburg, FL
Bid Date: Jul 14 2025
St. Petersburg, FL
Bid Date: Nov 18 2025
St. Petersburg, FL
Bid Date: Oct 30 2025
St. Petersburg, FL
--
St. Petersburg, FL
Bid Date: Jan 08 2026
St. Petersburg, FL
--
St. Petersburg, FL
Bid Date: Sep 13 2023
St. Petersburg Warehouse / Distribution - Pre-Engineered Storage Building New Construction - 4736649
St. Petersburg, FL
Bid Date: Jun 08 2022
Clearwater, FL
--
Winter Park, FL
--
Fruit Cove, FL
Bid Date: Mar 12 2025
Winter Park, FL
--
Orlando, FL
Bid Date: Mar 11 2025
Jacksonville, FL
Bid Date: Mar 18 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
