BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 20, 2025 at 8:00 PM

Updated March 21, 2025

Site work for a civil project in Johnson Creek, Wisconsin. Completed plans call for site work for a water / sewer project.

Description: In general, Work consists of the following: o Site Exterior o Existing Control Building: o Install two VFDs for existing digested sludge pumps o Install new digested sludge pumps o Process piping modifications o Update/modify main control panel and SCADA system as needed to accommodate new dewatering equipment o Dewatering Building: o Demolish concrete reaction tank, mixer, and appurtenances o Demolish sludge feed pump and piping o Demolish plate and frame press, access platforms o Demolish shaftless screw conveyors o Demolish motor control center o Install polymer feed skid system o Install new volute press, including structural support and access platform o Install new dewatered sludge hopper o Install new sludge dehumidification system o Install four new shaftless screw conveyors o Floor slab modifications and concrete equipment pads o Replace roof exhaust fan o HVAC ductwork modifications and infill wall lovers o HVAC controls modifications and install new split AC system for electrical room o New exterior wall louvers for dehumidifier condenser exhaust fans o Floor drain and plumbing modifications o Replace overhead door motorized opener o Replace exterior hollow metal personnel doors o Electrical and controls modifications associated with new process equipment Along with miscellaneous improvements, removals, restoration, and correlated appurtenances. Direct inquiries to Engineer's Project Engineer, Louis Sigtermans, at (952) 378-0040, or louis.sigtermans@stantec.com. Question Deadline 03/11/2025 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information for such questions provided in the Advertisement for Bids. 7.03 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven days prior to the date for opening of Bids may not be answered.

Post-Bid

Water / Sewer

$600,000.00

Public - City

Site Work

61

28

5

5

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
362
Active Projects
123
Bidding Soon
2,186
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2025

April 17, 2025

Project location map

200 Aztalan St, Johnson Creek, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.