EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 19, 2025 at 8:00 PM

Updated October 1, 2024

Site work for a bridge / tunnel in Bainbridge Island, Washington. Completed plans call for site work for a bridge / tunnel.

All bid proposals must be on the form provided and must be accompanied by a bid surety in an amount equal to five percent (5%) of the amount of the bid proposal. A bid surety may be submitted as a cashier's check, postal money order, or surety bond. (The amount of the surety bond may be stated either as a dollar amount or as a percentage of the bid proposal.) Should the successful bidder fail to enter into such contract and furnish satisfactory payment and performance bonds within the time stated in this Project Manual, then the bid proposal deposit shall be forfeited to the City of Bainbridge Island. Additionally, this project is subject to the apprenticeship requirements of RCW39.04.320. The apprenticeship requirements are set forth in General Special Provision (GSP) 1-07.9(3) in this contract. Est. Value Notes: Engineer's Estimate $2.6 million Est. Completion Date: Nov. 30, 2025 This project aims to enhance the Cooper Creek system to support local fish populations, particularly anadromous species like salmon and trout. The key objectives include creating a more natural stream bed and ensuring fish can move freely at all tidal levels. The project involves replacing the existing 30-inch concrete culvert with a new box culvert to restore the stream's natural flow, reconnecting 9,000 square feet of intertidal salt marsh to regular and complete tidal flows, and eliminating the predator trap currently created by the culvert. This will provide immediate access to approximately one mile of high-quality habitat for Coho and Chum salmon, as well as Coastal Cutthroat trout. The project will enhance both freshwater and intertidal habitats, benefiting native salmon and trout species, including the ESA-listed Chinook salmon. Additionally, this project accommodates and adds non-motorized improvements over the culvert and includes concurrent coordination with the Eagle Harbor Drive and Wyatt Way Non-Motorized Improvements. Construction activities must align with the environmental goals and regulatory requirements outlined for the project. The City of Bainbridge Island reserves the right to reject any or all bids and to waive informalities in the bidding process. The contract will be awarded to the lowest responsible bidder. Bidders must meet the mandatory responsibility criteria required by RCW 39.04.350 and any supplemental criteria described in the Contract Documents. Bidders should verify they meet the responsibility criteria before submitting a bid. The City of Bainbridge Island is committed to a program of equal employment opportunity regardless of race, color, creed, sex, age, national origin, or the presence of any sensory, mental, or physical disability. Title VI Notice: The City of Bainbridge Island fully complies with Title VI of the Civil Rights Acts of 1964 and related statutes and regulations in all programs and activities. The City of Bainbridge Island, in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally-Assisted Programs of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively ensure that, in any contract entered into pursuant to this advertisement, disadvantaged business enterprises as defined at 49 CFR Part 26 will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, national origin, or sex in consideration for an award. Americans with Disabilities Act (ADA) Notice: Individuals requiring reasonable accommodations may request written materials in alternate formats, sign language interpreters, and physical accessibility accommodations. For more information, contact the City Clerk's office at 206.842.2545 and/or cityclerk@bainbridgewa.gov.

GC Bidding

Bridges / Tunnels

$2,600,000.00

Public - City

Site Work

23

15

20

5

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
63
Bidding Soon
943
All Active Projects
388
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 21, 2025

May 21, 2025

img_map_placeholder

Eagle Harbor Dr NE & Wyatt Way NW, Bainbridge Island, WA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Eagle Harbor Fish Passage (Cooper Creek) Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.