Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 17, 2025 at 8:00 PM

Updated June 18, 2025

This is a service / maintenance or supply contract in Regina, Saskatchewan. Contact the soliciting agency for additional information.

Reference Number 0000287569 Question Acceptance Deadline 2025/02/24 03:00:00 PM CST The Contractor shall be responsible for the layout, fabrication, supply and delivery, including offloading of a precast cable trench system (the “Goods”) at the Rowatt Switching Station (the “Site”). Rowatt Switching Station is located at NE-36-15-19-W2M. Cable Trench Fabrication As per the supplied Cable Trench Layout drawing, the Contractor shall be responsible for finalizing the layout of the trench system based on the specific product line. The Contractor shall also determine the most effective location of all cable trench joints, specific sizes for special pieces (i.e. channel corners, T-sections, cross-connections, connections between different size channels) and sizes for end caps. 2.1 Cable Trench Cable trench shall be fabricated from a non-metal dielectric material, shall be nonporous and shall resist the degrading action of freeze/thaw cycles. The trench shall be self-supporting and equipped with easy access covers. For 45 degree corners and T connections, connection plates shall be provided by the vendor to secure gaps so no crushed rock or pit run can penetrate through trench from walls. For straight runs of cable trenches, provide mounting hardware such that adjacent cable trenches do not separate over time. 2.2 Access Covers All access covers for the Precast Cable Trench shall conform to the following specifications unless otherwise specified by the Engineer. Covers shall be fabricated from a non-metal dielectric material, shall be nonporous and shall resist the degrading action of freeze/thaw cycles. Unless otherwise specified, all covers shall be capable of H-20 loading conditions 14,500 kg (32,000 lbs) per axle. Lids capable of H-40 loading 29,000 kg (64,000 lbs) shall also be supplied for locations where heavy load road crossings are specified on the drawings. The Contractor is to provide cable trench cover lifting tool which shall provide a means to lock in place when lifting covers and be ergonomically designed to be safely operable by a maximum of 2 personnel. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Award

Power Plant

Public - State/Provincial

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
38
Active Projects
10
Bidding Soon
219
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2025

April 3, 2025

Project location map

NE36-15-19-W2, Regina, SK

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed