Published March 20, 2025 at 8:00 PM

Updated October 1, 2024

Site work, paving and renovation of a mixed-use development in Detroit, Michigan. Completed plans call for the renovation of a sidewalk / parking lot; for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; and water / sewer project.

Project name: CSO Facilities Improvements at Oakwood & Leib Project owner: Great Lakes Water Authority Project location: Oakwood CSO: 12220 Pleasant St., Detroit, MI 48217 & Leib CSO: 2188 Mt Elliott St., Detroit, MI 48207 Contract number: REQ-0002364 Project highlights: Perform improvements to the Oakwood CSO Retention Treatment Basin (RTB) and Pump Station (PS) and the Leib CSO Screening Disinfection Facility (SDF). Project description: The Great Lakes Water Authority (GLWA) requests bids from construction companies ("Contractor") to perform the improvements to the Oakwood CSO Retention Treatment Basin (RTB) and Pump Station (PS) and the Leib CSO Screening and Disinfection Facility (SDF) per the Specifications and Drawings. The Oakwood RTB & PS site is located at 12082 Pleasant St. in the City of Detroit and the Leib SDF site is located at 2188 Mt Elliot St. in the City of Detroit. 1. Oakwood CSO Retention Treatment Basin (RTB) and Pump Station - Contractor shall: a. Install Flow-paced and TRC-paced chemical feed control system. b. Replace existing chemical feed pumps and piping. c. Replace existing sodium hypochlorite storage tanks. d. Removal, modification at pump manufacturer's factory, factory testing, shipment back to site re-installation, and field testing of existing storm pumps to improve reliability. e. Complete modifications to storm pumps and sanitary pumps distributed control system programming. f. Replace the existing Doppler flow meters on the storm pump discharge pipes. g. Replace influent sampling system, and addition of pre-treatment and basin TRC sampling systems. h. Complete improvements to screw conveyor drainage. i. Complete modifications to the CSO Basin flushing valves and addition of basin drain sump mixing and flushing systems. j. Perform site improvements including improved drainage, onsite access roads and sidewalk repair. k. Elimination of cast-in-place stairs in sanitary wet well influent channels. l. I&C and electrical improvements needed to support process improvements. 2. Leib CSO Screening and Disinfection Facility (SDF: a. Install Flow-paced and TRC-paced chemical feed control system. b. Replace existing chemical feed pumps and piping. c. Replace existing sodium hypochlorite storage tanks. d. Replace existing effluent sampling system. e. Removal of chlorination mixers downstream of screens and replacement with chemical feed drop pipes in screen outlet channels. f. Improvements to screening chamber flushing system. g. HVAC and architectural improvements needed to comply with code requirements. h. Replacement of COPA(R) screens with new ROMAG screens and rehabilitation of existing ROMAG screens. i. Site improvements including alternate site access drive/gate. j. Improvements to additional process cameras and security system. k. I&C and electrical improvements needed to support process improvements. Special instructions: Proposals will only be accepted by Great Lakes Water Authority (GLWA) from firms or project teams demonstrating the following minimum qualifications: 1. Contractor, Subcontractors, and their Key Personnel (Project Managers and Superintendents) shall have completed a minimum of two (2) successful improvement / rehabilitation projects of existing, operating CSO treatment facilities, water resource recovery facilities, or water treatment plants of similar size and scope to this project in the last fifteen (15) years. These projects of similar size and scope shall demonstrate an ability to complete the following key elements of the project: (a) Installation of new or rehabilitation of existing screens (prefer in existing screen structure) (b) Installation of chemical feed and storage system in existing chemical room/facility (c) Replacement or modification of existing pumps integral to the main process train (d) Maintenance of facility operation throughout the construction duration 2. Contractor and subcontractor key personnel shall have a minimum of ten (10) years of experience performing similar duties on construction projects of similar size as this project 3. The Progress Schedule Preparer shall have no less than ten (10) years of experience using the scheduling software required on construction projects of similar size of this project. 4. The required B.I.D. Program documents shall be submitted is as follows: (a) Diversity Plan -Interested vendors shall submit an executive summary detailing key points of its diversity plan in no more than three (3) pages at an 11-point font size. The executive summary must specify vendor's method for maximizing opportunities for inclusion and diversity participation for this solicitation. Project estimate: Project categories: Waste Management Facilities, Water & Sewer Contact information Contact name: Dana Thurman Contact phone: 313-348-8457 Contact email: dana.thurman@glwater.org Question Deadline 03/14/2025 at 12:00 PM ET online submission.

GC Bidding

Water / Sewer

$1,440,000.00

Public - City

Paving, Renovation, Site Work

136

32

529

3

Subscribe For Documents

56 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Work Restrictions, Coordination with Occupants, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Progress Payment Procedures, Administrative Requirements, Project Management and Coordination, Project Meetings, Construction Progress Documentation, Construction Progress Schedule, Photographic Documentation, Submittal Procedures, Certificates, Special Procedures, Quality Requirements, Regulatory Requirements, References, Reference Standards, Quality Assurance, Manufacturer Qualifications, Installer Qualifications, Field Samples, Temporary Facilities and Controls, Temporary Utilities, Temporary Fire Protection, Temporary Lighting, Temporary Water, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Temporary Construction, Vehicular Access and Parking, Temporary Access Roads, Temporary Parking Areas, Temporary Roads, Traffic Control, Temporary Barriers and Enclosures, Temporary Barricades, Temporary Fencing, Temporary Controls, Project Identification, Temporary Project Signage, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Execution, Application, Erection, Installation, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Site Maintenance, Final Cleaning, Starting and Adjusting, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Spare Parts, Extra Stock Materials, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Site Remediation, Chemical Decontamination
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete, Grouting
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing, Metal Fabrications, Metal Gratings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Roofing and Siding Panels, Metal Roof Panels, Membrane Roofing, Flashing and Sheet Metal, Sheet Metal Flashing and Trim, Flexible Flashing, Roof and Wall Specialties and Accessories, Roof Accessories, Manufactured Curbs, Fire and Smoke Protection, Firestopping, Joint Protection, Preformed Joint Seals, Joint Fillers, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Wall Finishes, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Educational and Scientific Equipment, Audio-Video Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets, Furniture, Residential Furniture, Beds
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Identification for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Domestic Water Pumps, Facility Storm Drainage, Plumbing Equipment, Domestic Water Filtration Equipment, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Identification for HVAC Piping and Equipment, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Air Duct Accessories, Flexible Connectors, Air Outlets and Inlets
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Overcurrent Protective Device Coordination Study, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Power Filters and Conditioners, Capacitors, Lighting, Interior Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities, Culverts, Electrical Utilities, Utility Substations, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Gas and Vapor Process Piping, Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Cranes, Jib Cranes, Lifting Devices, Lifts, Specialty Material Handling Equipment, Lubrication Systems, Manufacturing Equipment, Finishing Equipment, Coating Equipment
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
222
Active Projects
145
Bidding Soon
1,613
All Active Projects
763
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 11, 2025

June 10, 2025

img_map_placeholder

Multiple Locations, Detroit, MI


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

CSO Facilities Improvements at Oakwood and Leib

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.