Published March 20, 2025 at 8:00 PM
Updated October 1, 2024
Site work, paving and renovation of a mixed-use development in Detroit, Michigan. Completed plans call for the renovation of a sidewalk / parking lot; for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; and water / sewer project.
Project name: CSO Facilities Improvements at Oakwood & Leib Project owner: Great Lakes Water Authority Project location: Oakwood CSO: 12220 Pleasant St., Detroit, MI 48217 & Leib CSO: 2188 Mt Elliott St., Detroit, MI 48207 Contract number: REQ-0002364 Project highlights: Perform improvements to the Oakwood CSO Retention Treatment Basin (RTB) and Pump Station (PS) and the Leib CSO Screening Disinfection Facility (SDF). Project description: The Great Lakes Water Authority (GLWA) requests bids from construction companies ("Contractor") to perform the improvements to the Oakwood CSO Retention Treatment Basin (RTB) and Pump Station (PS) and the Leib CSO Screening and Disinfection Facility (SDF) per the Specifications and Drawings. The Oakwood RTB & PS site is located at 12082 Pleasant St. in the City of Detroit and the Leib SDF site is located at 2188 Mt Elliot St. in the City of Detroit. 1. Oakwood CSO Retention Treatment Basin (RTB) and Pump Station - Contractor shall: a. Install Flow-paced and TRC-paced chemical feed control system. b. Replace existing chemical feed pumps and piping. c. Replace existing sodium hypochlorite storage tanks. d. Removal, modification at pump manufacturer's factory, factory testing, shipment back to site re-installation, and field testing of existing storm pumps to improve reliability. e. Complete modifications to storm pumps and sanitary pumps distributed control system programming. f. Replace the existing Doppler flow meters on the storm pump discharge pipes. g. Replace influent sampling system, and addition of pre-treatment and basin TRC sampling systems. h. Complete improvements to screw conveyor drainage. i. Complete modifications to the CSO Basin flushing valves and addition of basin drain sump mixing and flushing systems. j. Perform site improvements including improved drainage, onsite access roads and sidewalk repair. k. Elimination of cast-in-place stairs in sanitary wet well influent channels. l. I&C and electrical improvements needed to support process improvements. 2. Leib CSO Screening and Disinfection Facility (SDF: a. Install Flow-paced and TRC-paced chemical feed control system. b. Replace existing chemical feed pumps and piping. c. Replace existing sodium hypochlorite storage tanks. d. Replace existing effluent sampling system. e. Removal of chlorination mixers downstream of screens and replacement with chemical feed drop pipes in screen outlet channels. f. Improvements to screening chamber flushing system. g. HVAC and architectural improvements needed to comply with code requirements. h. Replacement of COPA(R) screens with new ROMAG screens and rehabilitation of existing ROMAG screens. i. Site improvements including alternate site access drive/gate. j. Improvements to additional process cameras and security system. k. I&C and electrical improvements needed to support process improvements. Special instructions: Proposals will only be accepted by Great Lakes Water Authority (GLWA) from firms or project teams demonstrating the following minimum qualifications: 1. Contractor, Subcontractors, and their Key Personnel (Project Managers and Superintendents) shall have completed a minimum of two (2) successful improvement / rehabilitation projects of existing, operating CSO treatment facilities, water resource recovery facilities, or water treatment plants of similar size and scope to this project in the last fifteen (15) years. These projects of similar size and scope shall demonstrate an ability to complete the following key elements of the project: (a) Installation of new or rehabilitation of existing screens (prefer in existing screen structure) (b) Installation of chemical feed and storage system in existing chemical room/facility (c) Replacement or modification of existing pumps integral to the main process train (d) Maintenance of facility operation throughout the construction duration 2. Contractor and subcontractor key personnel shall have a minimum of ten (10) years of experience performing similar duties on construction projects of similar size as this project 3. The Progress Schedule Preparer shall have no less than ten (10) years of experience using the scheduling software required on construction projects of similar size of this project. 4. The required B.I.D. Program documents shall be submitted is as follows: (a) Diversity Plan -Interested vendors shall submit an executive summary detailing key points of its diversity plan in no more than three (3) pages at an 11-point font size. The executive summary must specify vendor's method for maximizing opportunities for inclusion and diversity participation for this solicitation. Project estimate: Project categories: Waste Management Facilities, Water & Sewer Contact information Contact name: Dana Thurman Contact phone: 313-348-8457 Contact email: dana.thurman@glwater.org Question Deadline 03/14/2025 at 12:00 PM ET online submission.
GC Bidding
Water / Sewer
$1,440,000.00
Public - City
Paving, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 11, 2025
June 10, 2025
Multiple Locations, Detroit, MI
Related To This Project
Detroit, MI
Bid Date: Mar 18 2025
Detroit, MI
Bid Date: Mar 10 2025
Detroit, MI
Bid Date: Feb 27 2025
Detroit, MI
Bid Date: Feb 27 2025
Detroit, MI
--
Detroit, MI
Bid Date: Feb 20 2025
Detroit, MI
Bid Date: Mar 24 2025
Detroit, MI
Bid Date: Feb 21 2025
Detroit, MI
--
Detroit, MI
Bid Date: Mar 19 2025
Detroit, MI
Bid Date: Mar 19 2025
Detroit, MI
Bid Date: Mar 06 2025
Detroit, MI
Bid Date: Feb 26 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.