BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 11, 2025 at 8:00 PM

Updated March 16, 2025

This is a service / maintenance or supply contract in Moody AFB, Georgia. Contact the soliciting agency for additional information.

***Changes occurred 09 Mar 2025, they are: Amendment 0003 - The purpose of this Amendment is to: 1. Post Questions and Answers from Offerors in Attachment 6. 2. See Attachment 6 for details. ***End of Amendment 0003*** **Changes occurred 20 Feb 2025, they are: Amendment 0001 - The purpose of this Amendment is to: 1. Make a change to Attachment 1 - SOW to remove Para 1.3.1. concerning permits. 2. Add new Para 1.3.1 to SOW, informing Vendors that Arborist are preferred. 3. Add new Para 1.3.2 to SOW, informing Vendors of necessary use of proper PPE as/if appropriate. 4. Make a change to Attachment 2 - Price list. Unit changed from "Each" to "Hours" for CLIN 0014 Brush Hog Services. 5. Inform Vendors that this BPA requirement will not have a "Site Visit." This requirement will be a BPA with work scheduled as necessary. **See Attached Amendment 0001, also see Attachment 1 - SOW, & Attachment 2 - Price List for changes. Note: Tree Trimming & Tree Removal Services will be performed through-out year/season, and after storms as necessary. Currently, there are no trees to trim/remove, however, seasonal work, work after storm, etc... is normal and anticipated. Any further questions, email Contact or POC listed with this RFQ. ***End of Amendment 0001*** Contractor will furnish all labor, climbers, equipment/tools, materials/supplies, vehicles, mobile aerial platforms, and protective equipment required to perform the following actions within Moody Air Force Base and Grassy Pond recreational area. The Contractor shall remove identified tree(s) and associated stump(s) to include all debris caused during removal. When removing trees, grinding of stumps is considered to be part of the same operation and shall be priced to include both tree removal and stump grinding.. Contractor shall load, and transport natural debris as identified by the COR. Contractor shall remove, transport and deposit all debris generated from tree removal operations, trimming operations, and natural debris piles identified by the COR to an off-base site. Contractor shall use brush hog to remove small trees and vegetation in designated areas identified by the COR. Questions and Answers: Should you have any questions about this requirement, please submit them via email. Last day to submit questions is 3 Mar 2025. Answers to all questions will be either be posted online or distributed via email. Primary Point of Contact: Victor T. Houston, Email: victor.houston.1@us.af.mil; Phone:229-257-1502 Alternate Point of Contact: Organization Box, Email: 23CONS.LGCB@us.af.mil **BPA will be valid for 5 years from 15 Mar 2025 to 14 Mar 2026.

Post-Bid

Military

Public - Federal

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
26
Bidding Soon
543
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 15, 2025

March 15, 2025

Project location map

Multiple Locations, Moody AFB, GA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.