Demolition, site work, paving and new construction of a bridge / tunnel in Mc Grath, Alaska. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Cr 61 Bridge Replacement Over Beeswax Creek for Constructing the Following: Bridge Replacement and Approaches on Cr-61 Over Beeswax Creek in the City of Columbiana, Alabama The Bracket Estimate on This Project is From $1,600,000 to $1,950,000. This Bracket Range is Shown Only to Provide General Financial Information to Contractors and Bonding Companies Concerning the Project's Complexity and Size. This Bracket Should Not Be Used in Preparing a Bid, Nor Will This Bracket Have Any Bearing On the Decision to Award the Contract. The Principal Items of Work Are Approximately as Follows: An Overview of Pay Items Includes: Clearing and Grubbing Removal of Old Bridge Unclassified & Borrow Excavation Bituminous Concrete Wearing Surface, Upper Binder & Lower Binder Layers Various Bridge Items Including Piling, Drilled Shafts, and Concrete Girders 18" Roadway Pipe, Various Junction Boxes & Inlets Guardrail and End Anchors Various Erosion Control Items Various Traffic Striping, Markings, Legends, and Pavement Markers Various Temporary Traffic Control Items The Entire Project Shall Be Completed in 140 Working Days. Requests for Information Shall Be Accepted From Bidders Until Monday, February 17, 2025 at 2:00 P.m. Bidders With Questions May Submit Them via Email, Telephone, or in Person at the Office of the County Engineer. A Cashier's Check (Drawn on an Alabama Bank) or Bid Bond for 5% of the Amount Bid (Maximum of $10,000.00) And Made Payable to the Shelby County Commission Must Accompany Each Bid as Evidence of Good Faith. Proof of Insurance Coverages of the Types and Amounts as Set Forth in the Project Specifications Will Be Required of the Contractor, and Any and All Subcontractors, Prior to Beginning Work. The Contractor Will Be Required to Perform Work Amounting to at Least 30% of the Total Contract Cost With His Own Organization. This is a County-funded Project. The Proposed Work Shall Be Performed in Conformity With All Applicable Laws, Rules, and Regulations. The Right to Reject Any or All Bids is Reserved. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Bridges / Tunnels

$2,535,754.00

Public - County

Demolition, New Construction, Paving, Site Work

57

5

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1
Active Projects
0
Bidding Soon
9
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 18, 2025

April 21, 2025

Project location map

Multiple Locations, Mc Grath, AK

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.