BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 21, 2025 at 7:00 PM

Updated February 25, 2025

Site work for a power facility in Newberry, Florida. Conceptual plans call for site work for a power facility.

Question Period Ends Tuesday, February 13, 2025, 2:00 PM ET Online portal The City of Newberry has been granted a Special Category Grant by Florida Department of State Division of Historical Resources to provide partial funding for the "City of Newberry Historical Power Plant Rehabilitation" project. The City is seeking services from an architect qualified in historic preservation to facilitate the rehabilitation of Newberry's original power plant constructed in 1913 and listed on the National Historic Register reference number 87002150. The City of Newberry, Florida Commissioners desire to receive proposals from qualified Historic Preservation Architect to coordinate the restoration and preservation of the Historic Newberry Electric Power Plant, located near the Public Works Department, 120 NW 260th St, Newberry, FL 32669. The historic architect shall coordinate the preservation, repair, and restoration of a buildings original features and character-defining elements while adhering to historical accuracy, local preservation guidelines, and relevant regulations, ensuring the project maintains the buildins cultural significance while allowing for necessary functional updates specified in the grant in collaboration with City Staff. For consideration, respondents will be required to meet all requirements set forth by the Advisory Council for Historic Preservation for state and local government historic preservation programs stated in 36 CFR 61 for Historic Architecture with a professional degree in architecture, registered as Registered Architect (RA) with State of Florida, and must have experience on historic preservation projects including work experience and examples of similar projects. Responses to this request must contain evidence of the experience and ability to perform the specified services identified within this Request for Qualifications (RFQ). The selected firm must be approved by the Florida Department of State (DOS). If DOS rejects the selected firm, the City will be required to consider the next firm on the ranking list. The services may include, but are not necessarily limited to, assessments, advice and consultation; historic preservation planning and design; project design oversight consultation; construction consultation, observation and contract management services and other services in the areas of preservation/restoration/renovation of historic structures, construction/structural programming, and other areas such as engineering as necessary to implement the City`s contemplated projects. Any professional services awarded through this RFQ will be for projects that do not exceed threshold requirements pursuant to Florida Statute 287.055.

Conceptual

Power Plant

$100,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
179
Active Projects
90
Bidding Soon
1,135
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 25, 2026

Project location map

120 NW 260th St, Newberry, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.