Site work for a civil project in Knoxville, Tennessee. Completed plans call for site work for a water / sewer project.

The Project consists of clearing, grubbing, drainage, tunneling and erosion control for the storm water improvements Each Bid must be accompanied by a certified check or by a Bidders Bond executed by the Bidder and a surety company licensed to do business in Tennessee in the sum of five percent (5%) of the amount of the Bid. The successful Bidder will be required to execute an acceptable performance and payment bond in the amount equal to one hundred percent (100%) of the Contract price within thirty (30) calendar days of contract award notice. Questions regarding this bid request shall be directed, in writing, to Brian Hubbs, Construction and Contract Specialist, 1000 N. Central Street, Suite 100, Knoxville, TN 37917 at brian.hubbs@knoxcounty.org (Telephone 865-215-5753) no later than Monday, March 10, 2025 at 4:30 p.m. local time. All technical questions will be addressed by written addendum issued by Knox County Procurement.

Post-Bid

Water / Sewer

$300,000.00

Public - County

Site Work

14

10

2

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Work Restrictions, Use of Site, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Construction Progress Documentation, Construction Progress Reporting, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Control, Testing Laboratory Services, Temporary Facilities and Controls, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Residential Furniture, Beds
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Erosion and Sedimentation Controls, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting, Turf and Grasses, Seeding, Plants, Shrubs
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
31
Bidding Soon
453
All Active Projects
200
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 19, 2025

April 18, 2025

img_map_placeholder

Multiple Locations, Knoxville, TN

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Bluegrass Lake Stormwater Mitigation Contract A - Discharge Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.