Site work for a water / sewer project in Locust Grove, Oklahoma. Completed plans call for site work for a water / sewer project.
**As of September 09, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** The GRDA Markham Ferry Hydroelectric Facility has four vertical Kaplan units with Alstom TSLG speed regulators. Each of the four generators is rated 30MVA, 13.8kV, 90 RPM. This specification is to upgrade the Alstom TSLG speed regulator for each unit with a new turbine governor controller. The existing Alstom TSLG speed regulator and GE human-machine interface (HMI) in each Unit Cabinet (U1-CAB-001 to U4-CAB-001) shall be replaced with a new controller in the same panel. The new controllers shall provide wicket gate and blade control including off-line speed control, on-line load control, and frequency response. The existing speed regulators have network and hardwired interfaces to the existing unit control system. The new controllers shall have a similar network and hardwired interfaces as described in this specification. The Bidder shall include in the Proposal a bid sheet with cost to demolish the existing speed regulator, and furnish, install, wire, and commission the new turbine controls, including modification of the existing control system to interface and incorporate the new system. The Bidder shall include in the Proposal a separate bid sheet with cost to furnish and commission the new turbine controls, including modification of the existing control system to interface and incorporate the new system. For this optional scope, existing speed regulator demo and new controller installation and wiring will be performed by the GRDA. The Bidder shall include in the Proposal a description of the proposed governor control upgrade including a list of new equipment and other devices that will be furnished. The Bidder shall include in the Proposal an equipment access schedule so that GRDA can determine operational / outage impacts and plan accordingly. The Bidder shall include in the Proposal a separate line item to provide detailed design modifications required to field wiring for other interfaces with the new controller. The Contractor shall be responsible for new controller testing, startup, and commissioning. The Contractor shall be responsible for NERC model testing / validation and required reporting to GRDA. The Contractor shall provide operations, maintenance, and programming training for the new controllers. Questions regarding this RFP must be submitted electronically via Bid Express on or before Tuesday, July 1, 2025 at 3:00pm Central Time. No questions may be submitted orally, fax, phone, or email. GRDA may reject any bid that GRDA considers to be incomplete, improper, or non-responsive, in GRDA's sole discretion. This may include, but is not limited to, Bids in which the Bidder submits another form of Contract in lieu of the attached Contract. Bids will become the property of GRDA upon submission. Exceptions taken to the Contract terms and/or Bidding Documents may be cause for rejection of a Bid.
Post-Bid
Water / Sewer
$800,000.00
Public - State/Provincial
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
1
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 23, 2025
August 8, 2025
State Hwy 82, Locust Grove, OK
Related To This Project
Locust Grove, OK
Bid Date: Mar 25 2025
Locust Grove, OK
Bid Date: Apr 03 2025
Locust Grove, OK
Bid Date: May 13 2025
Locust Grove, OK
Bid Date: Apr 28 2025
Locust Grove, OK
Bid Date: Apr 22 2025
Locust Grove, OK
Bid Date: May 30 2025
Locust Grove, OK
Bid Date: May 30 2025
Locust Grove, OK
Bid Date: May 28 2025
Locust Grove, OK
Bid Date: Feb 27 2025
Locust Grove, OK
Bid Date: Jan 31 2025
Locust Grove, OK
Bid Date: Jan 29 2025
Locust Grove, OK
Bid Date: Jan 17 2025
Locust Grove, OK
Bid Date: Jan 03 2025
Locust Grove, OK
Bid Date: May 15 2025
Locust Grove, OK
Bid Date: Dec 17 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.