Site work for a water / sewer project in Birmingham, Alabama. Completed plans call for site work for a water / sewer project.

The Work consists of, but is not limited to the installation of approximately 695' of 8" DICL "Zinc Coated" pipe; 3,650' of 6" DICL "Zinc Coated" pipe; 1,730' of4" DICL "Zinc Coated" pipe; and 119 water services and other miscellaneous associated items as necessary to complete the Work along Linpark Drive; 46th Street South; Linwood Circle; Linwood Drive; 44th Place South; 47th Street South; 9th Avenue South; 47th Way South; 47th Place South; 48th Street South; 10th Avenue South; 43rd Place South; and 43rd Street South located in the City of Birmingham, Alabama. No Bidder may withdraw or alter his bid within ninety (90) calendar days after the actual date of the Bid Opening. Each Bid shall be accompanied by a certified check or Bid Bond in the amount of five percent (5%) of the bid not to exceed $10,000.00 in the form and subject to conditions provided for in Section 00435, Bid Bond. The Successful Bidder will be required to furnish a Performance Bond and a Labor & Material Payment Bond each in an amount equal to one hundred percent (100%) of the Contract Award. Each Prospective Bidder shall read and understand the Alabama Department of Revenue's (ADOR's) sales and use tax exemption policy pursuant to Act 2013-205 Section 1(g) [CONTRACTOR accounts for the sales tax not included in the Bid Form by submitting an Accounting of Sales Tax -Attachment to BWWB Bid Form], Failure to provide an accounting of sales tax shall render the Bid non-responsive. Other than determining responsiveness, sales tax accounting shall not affect the bid pricing nor be considered in the determination of the lowest responsible and responsive bidder. After Notice of Award, Prime Contractor and Subcontractor(s) licensed by the State Licensing Board for General Contractors must comply with ADOR reporting requirements for the duration of the project. For further information see Section 00409, Alabama Department of Revenue-Sales and Use Tax Exemption, Section 00200 Instruction to Bidders (Article 33) and refer to paragraph 6.10 in the Supplementary Conditions. If a Contract is to be awarded, it will be awarded to the lowest responsive and responsible Bidder, who has neither been disqualified nor rejected pursuant to these Contract Documents, and whose Bid based on an evaluation by the OWNER indicates that the award will be in the best interest of the project and will result in the lowest overall cost to the OWNER for completion of the project. Unless extended by OWNER, a Contract will be awarded within ninety (90) calendar days after the day of the opening of Bids. The OWNER reserves the right to reject any and all proposals, the right to waive irregularities or to accept any proposal deemed to be in the best interest of the OWNER.

Post-Bid

Water / Sewer

$300,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
34
Bidding Soon
466
All Active Projects
248
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 13, 2025

April 14, 2025

img_map_placeholder

Multiple Locations, Birmingham, AL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Water Main Replacement Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.