Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 20, 2025 at 7:00 PM
Updated February 21, 2025
This is a service / maintenance or supply contract in Salinas, California. Contact the soliciting agency for additional information.
The City of Salinas is requesting proposals from engineering firms experienced in transportation projects to provide engineering, environmental, land surveying, and construction support services for the Harden Parkway Path and Safe Routes to School Project. The Consultant selected shall provide all services to complete the Project Approval and Environmental Document (PA&ED) phase, and the Plans, Specifications, and Estimates (PS&E) for the Harden Parkway Path and Safe Routes to School Project. The Consultant shall also provide support during construction to respond to design related request for information and material submittals. The construction phase of this project is Federally Funded. The PA&ED and Design phases are state only funded and requirements of Chapter 10 of the "Local Assistance Procedures Manual The project consists of 0.77-mile road diet on Harden Parkway from El Dorado Drive to Regency Circle. The road diet will transform a 4- lane roadway to a 2-lane roadway with a roundabout at McKinnon Street, 2-way multiuse path separated by a planted stormwater bio-swales, and accessible sidewalks. Connecting to Harden Parkway, the project includes safe routes to school improvements on McKinnon Street including protected bike lanes connecting the proposed multiuse path on Harden Parkway to newly installed bike facilities on East Alvin Drive, high-visibility crosswalk in front of Harden Middle School and curb extensions along Westminster Drive connecting McKinnon Street to El Dorado Park. The project will also include non-infrastructure community engagement and safe routes to school education and encouragement programming (not part of this scope of work). Online Q&A Yes Q&A Deadline 02/25/2025 1:00 PM (PST)
Conceptual
Sidewalks / Parking Lot
Public - City
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 4, 2026
Multiple Locations, Salinas, CA
Related To This Project
Salinas, CA
Bid Date: Mar 31 2025
Salinas, CA
Bid Date: Mar 14 2025
Salinas, CA
Bid Date: Mar 27 2025
Salinas, CA
Bid Date: Jun 19 2025
Salinas, CA
Bid Date: Mar 28 2025
Salinas, CA
Bid Date: Apr 10 2025
Salinas, CA
Bid Date: Mar 26 2025
Salinas, CA
Bid Date: Mar 26 2025
Salinas, CA
Bid Date: Mar 06 2025
Salinas, CA
Bid Date: Apr 25 2025
Salinas, CA
Bid Date: Feb 28 2025
Salinas, CA
Bid Date: Feb 28 2025
Salinas, CA
Bid Date: Apr 01 2025
Salinas, CA
Bid Date: Feb 27 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
