Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 6, 2025 at 7:00 PM
Updated December 7, 2025
Site work, paving and new construction of a mixed-use development in Pasadena, Texas. Completed plans call for site work for a 5,010-square-foot playground / park / athletic field; for the construction of a educational facility; and for paving for a sidewalk / parking lot.
Question Deadline 12/09/2025 at 4:00 PM CT Each Offeror must submit the following items via email to Laurie Pruett This new Softball Athletic complex includes, three new Softball Fields, (A, B, C) with Bullpens, batting cages, pre-engineered aluminum grandstands with engineered foundation and structural steel framing, athletic fields include field drainage system, solid sod /synthetic turf, fencing /netting, stadium lighting, scoreboards are OFCI. Ticket Booth, Concessions, Restroom Buildings. Press box includes concrete foundations, SOG /SOD, masonry back-up walls with brick façade, insulation board, waterproofing, conventional structural steel, metal roof deck with insulation board, mod bit type roofing, wood roof nailers, HM doors & frames, wall, floor, and ceiling finishes, p-lam casework, internally drained overhead roof systems. Restrooms /Concessions include similar construction with wall and floor tile, overhead rolling doors and counter shutters, toilet partitions and accessories. Dugout construction includes concrete foundations, masonry walls, steel framing, standing seam roofing, seating benches. The site scope of work includes: SWPPP, site demolition, underground utilities, landscaping, irrigation, concrete paving and sidewalks, parking lot lighting. HVAC package includes exhaust fans, mini-splits, and unit heaters. Technology systems include, underground fiber backbone, data cabling system, video surveillance, access control, intrusion system, and sound reinforcement. Substantial completion of new elementary school building is March 1, 2027. Substantial completion of Demolition of existing building is June 28, 2027 Questions/RFIs contact Brian Shannon at bshannon@drymalla.com Please send project related questions to Brian Shannon at bshannon@drymalla.com Start Date 02/09/2026 Finish Date 01/08/2027
GC Bidding
Educational
$17,730,000.00
Public - City
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 16, 2025
February 9, 2026
1515 Cherry Brook Ln, Pasadena, TX
Related To This Project
Pasadena, TX
Bid Date: Mar 10 2025
Pasadena, TX
Bid Date: Mar 26 2025
Pasadena, TX
Bid Date: Apr 09 2025
Pasadena, TX
Bid Date: Apr 07 2025
Pasadena, TX
--
Pasadena, TX
--
Pasadena, TX
Bid Date: Apr 16 2025
Pasadena, TX
--
Pasadena, TX
--
Pasadena, TX
Bid Date: Apr 08 2025
Pasadena, TX
Bid Date: Apr 03 2025
Pasadena, TX
Bid Date: Feb 24 2025
Pasadena, TX
Bid Date: Mar 10 2025
Pasadena, TX
Bid Date: Mar 17 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
