BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 27, 2026 at 7:00 PM

Updated February 28, 2026

Demolition, site work and new construction of a service station / car wash facility in Marlow, New Hampshire. Completed plans call for the construction of a service station / car wash facility; for site work for a service station / car wash facility; and for the demolition of a service station / car wash facility.

County : Cheshire This Project Consists of Constructing a New Vehicle Fueling Facility and Removing the Existing Fueling Facility on Nh 10 at the Marlow Shed (Ps403). Question Deadline 02/19/2026 - Bidders Should Act Promptly and Submit All Questions Pertaining to the Project in Writing to David Smith at David.s.smith@dot.nh.gov at Least Five (5) Business Days Before the Hour and Date Set for the Bid Opening. No Phone Calls or Faxes Will Be Accepted. The right is reserved to waive any informalities in or to reject any or all proposals NHDOT - Constructing a New Vehicle Fueling Facility and Removing the Existing Fueling Facility This project consists of constructing a new vehicle fueling facility and removing the existing fueling facility on NH 10 at the Marlow Shed (PS403). The Contractor shall provide all labor and materials to complete the work. The scope of work at the facility will include the installation of one (1) 8,000-gallon compartmented (4,000-gallon gasoline, 4,000-gallon diesel) underground storage tank (UST), one (1) two hose, two product suction dispenser and concrete fueling pad with pre-manufactured pump enclosure, and all other associated fueling system equipment and appurtenances. The project will also include the removal of one (1) existing 3,000-gallon diesel UST, one (1) existing dispenser and associated fueling pad, and all associated fueling system piping, equipment and appurtenances related to the existing fueling system at this location. Engineered shoring for the tank excavation will be required. There shall be no gap in fuel system service, availability, and operations from November 19 th , 2026, to March 31 st , 2027.

Post-Bid

Service Station / Car Wash

$843,128.00

Public - State/Provincial

Demolition, New Construction, Site Work

37

8

9

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
776
Active Projects
430
Bidding Soon
4,487
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 26, 2026

April 27, 2026

Project location map

NH-10, Marlow, NH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.