Published March 21, 2025 at 8:00 PM

Updated October 1, 2024

Renovation of an educational facility in San Francisco, California. Completed plans call for the renovation of a educational facility.

The estimated construction value of the work is $220,000. The Project is generally described as, but not limited to: Removal and disposal of five (5) existing packaged indoor heat pumps units in 5 classrooms and all related electrical and mechanical items; installation of five (5) new split heat pump systems for 5 classrooms; floor and wall patching work to match existing surrounding floor and walls; testing and commissioning of all new split heat pumps systems; and all associated architectural; electrical, mechanical and miscellaneous related work to complete the project. There is NO hazardous materials abatement work in the project. All Bid Proposals shall be submitted on forms furnished by the District. Bid Proposals must conform with, and be responsive to, the Bid and Contract Documents, copies of which may be obtained from the District as set forth above. Only Bid Proposals submitted to the District prior to the date and time set forth above for the public opening and reading of Bid Proposals shall be considered. 7. Contractor's License Classification. In accordance with the provisions of California Public Contract Code 3300, the District requires that Bidders possess the following classification(s) of California Contractors License at the time that the Bid Proposals are opened: Class B, General Building Contractor; C-4 Boiler, Hot Water Heating and Steam Fitting Contractor; OR C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor. Any Bidder not so duly and properly licensed shall be subject to all penalties imposed by law. 8. Bid Security. Each Bid Proposal shall be accompanied by Bid Security in the form of: (a) cash, (b) a certified or cashier's check made payable to the District or (c) an original Bid Bond, in the form and content attached hereto, in favor of the District executed by the Bidder as a principal and a Surety as surety (the "Bid Security") in an amount not less than ten (10%) percent of the amount of the Total Base Bid. Bid Proposals shall not be withdrawn by any Bidder for a period of ninety (90) days after the opening of Bid Proposals. During this time, all Bidders shall guarantee prices quoted in their respective Bid Proposals. The District reserves the right to reject any or all Bid Proposals or to waive any irregularities or informalities in any Bid Proposal or in the bidding. DVBE Participation Goal. The District has a Disabled Veteran Business Enterprise (DVBE) Participation Goal Program (the DVBE Program) which establishes a three percent (3%) Participation Goal for DVBEs. All Bidders are required by the District, pursuant to the DVBE Program, to submit DVBE Worksheets that confirm two (2) advertisements were published at least 14 days prior to bid opening. The Contract for the Work, if awarded, will be by action of the District's Board of Education to the responsible Bidder who submitted the lowest priced responsive Total Base Bid Proposal. The District reserves the right to reject any or all Bid Proposals or to waive any irregularities or informalities in any Bid Proposal or in the bidding. Questions received less than seven (7) days prior to the date for opening Bids may not be answered. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. San Francisco Unified School District Facilities, Design and Construction Dept. 135 Van Ness Avenue San Francisco, CA 94102 Tel: 415-828-7292 Fax: 415-355-6988 Contact: William Chow, SFUSD Project Manager Email: choww@sfusd.edu. The Agreement which the successful Bidder will be required to execute along with the forms and amounts of the Labor and Material Payment Bond, Performance Bond and other documents which will be required to be furnished are included in the Contract Documents and shall be carefully examined by the Bidder. The required number of executed copies of the Agreement and the form and content of the Performance Bond and the Labor and Material Payment Bond and other documents required at the time of execution of the Agreement will be specified by the SFUSD Contracts Office in its Notice of Recommendation to Award. Time for Completion: It is hereby understood and agreed that the Contractor shall complete the Work within 60 ( SIXTY ) [INDICATE NUMBER OF DAYS]

Bid Results

Educational

$231,800.00

Public - City

Renovation

15

10

6

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Bonds, Warranties, Commissioning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing, Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Specialty Placed Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Unit Masonry, Concrete Unit Masonry
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Hardware, Door Hardware
Division 09 - Finishes

Division 09 - Finishes

Tiling, Ceilings, Flooring, Terrazzo Flooring, Carpeting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Storage Specialties, Lockers, Exterior Specialties, Protective Covers, Canopies
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bath Furnishings, Multiple Seating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Identification for Plumbing Piping and Equipment, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Identification for HVAC Piping and Equipment, HVAC Insulation, Duct Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Central HVAC Equipment, Decentralized HVAC Equipment, Decentralized Unitary HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Excavation and Fill, Compaction
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment

Find More Local Projects

Within 75 Miles of This Project
197
Active Projects
113
Bidding Soon
1,897
All Active Projects
915
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 13, 2025

April 14, 2025

img_map_placeholder

2650 42nd Ave, San Francisco, CA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Ulloa Elementary School Indoor Heat Pumps Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.