Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 15, 2026 at 7:00 PM
Updated January 16, 2026
Renovation of a mixed-use development in Los Angeles, California. Completed plans call for the renovation of a educational facility.
Deadline for MEP subcontractors to be prequalified by the OWNER: December 15, 2025, occurring 5 business days prior to Bid Due Date. Bidder must only list MEP subcontractors that are prequalified by the OWNER as of this date. OWNER will attempt to ensure that all prequalified MEP subcontractors are placed on the OWNER's List of Prequalified MEP Subcontractors in a timely manner. However, if an MEP subcontractor does not appear on the list, bidder should verify with the subcontractor to determine if subcontractor has received a notice from OWNER that confirms its prequalification by the deadline. Bids that fail to adhere to this requirement will be deemed non-responsive by the OWNER. Bid security in the amount of ten (10) percent of the lump sum base bid, shall accompany each bid. A mandatory pre-bid meeting and pre-bid job walk will be held in . The bidder is responsible for ensuring that they have complete Bidding Documents including all Addenda provided by the OWNER, prior to the bid due date. Any bidder that does not attend a not mandatory pre-bid meeting shall be held accountable for any reasonably foreseen condition had they attended the meeting. Bidder is responsible for the cost of bid package. Cost for bid package is non-refundable. Bid package is no returnable. The Districts contract bond estimate is $4,635,000 The Contract Time is 330 days. OWNER has the right to reject any and all bids. OWNER has the right to deem any bid not accompanied by all items required by the Bidding Documents, or a bid which is in any other way deemed materially incomplete or irregular, as a non-responsive bid. Clarification or any other notice of a change in the Bidding Documents will be issued only by the OWNER office of Facilities Construction Contracts and only in the form of a written Addendum, transmitted by fax or e-mail to all who are known by the issuing office to have received a complete set of Bidding Documents. Any other purported Addenda are void and unenforceable. B. Bidder is responsible for ascertaining the disposition of all addenda issued regardless of OWNER notification and to acknowledge all addenda in the submitted sealed bid prior to the bid opening. In accordance with the Board of Education of the City of Los Angeles (Board) adoption of a participation goal of twenty-five percent (25%) for Small Business Enterprises (SBE) and five percent (5%) for all Veteran Business Enterprises (VBE), per contract, of the overall dollar amount of funds allocated to the school construction and modernization program, the OWNER requires bidders to submit SBE and VBE information as set forth in this section Question Deadline 12/15/2025 Each transmitted request shall contain the name of the person and/or firm filing the request, address, telephone and fax number, Specifications and/or Drawing number. Bidder is responsible for the legibility of hand written requests. Pre-bid clarification requests shall be filed a minimum of seven (7) days prior to bid opening. Each request for clarification shall be submitted in writing to only the person and/or firm designated
Bid Results
Educational
$3,193,904.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 7, 2026
March 9, 2026
6500 Hooper Ave., Los Angeles, CA
Related To This Project
Los Angeles, CA
--
Los Angeles, CA
--
Los Angeles, CA
Bid Date: Sep 30 2025
Los Angeles, CA
Bid Date: Dec 05 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
