Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 25, 2025 at 7:00 PM
Updated February 26, 2025
Site work and paving for a road / highway in New York, New York. Working plans call for site work for a road / highway; and for paving for a road / highway.
CONSTRUCTION COST Approximately $9.7 million PROJECT LOCATION: Route 204 (Brooks Ave) from Route 33A (Chili Ave) to City of Rochester, Town of Gates, Monroe County PROJECT OBJECTIVE(S) Restore the pavement surface and maintain the integrity of the pavement structure. Increase accommodations within the transportation corridor for pedestrian and other nonmotorized forms of travel. Improve closed drainage system in the area of railroad bridge to reduce maintenance needs. Single course mill and resurfacing between Chili Ave and Buell Rd and multi-course mill and resurfacing between Buell Rd and the City of Rochester. Install sidewalk on the south side of Route 204 from Buell Rd to City of Rochester and on the north side of Route 204 from Chili Ave to Marilou Dr. Replace traffic signals at Buell Rd, Deep Rock Rd, and Wegmans driveway. Install new closed drainage and widen shoulders between Old Beahan Rd and Sprucewood Ln. Reconstruct pavement, widen shoulders, reface retaining walls and improve drainage at the railroad underpass. Railroad bridge is owned and maintained by Rochester & Southern and will not be replaced as part of this project. Start Construction - Spring 2025 End Construction - June 30, 2026 If you have any questions or would like additional information, please contact NYSDOT’s Project Managers: Design: Joshua Brasacchio, PE 585-371-9246 joshua.brasacchio@dot.ny.gov Construction: Joe Shiner, PE 585-315-9626 joseph.shiner@dot.ny.gov WORK ZONE TRAFFIC CONTROL Work in the vicinity of the railroad underpass will require a complete closure of Route 204 for up to 12 weeks and will occur in 2025 construction season. Offsite detour will utilize Buell Rd and Chili Ave. All other work will be accomplished utilizing temporary daily lane and/or shoulder closures with flagging as needed. NY Bike Route 5 will be detoured and accommodated on Buell Rd and Chili Ave. Access to all properties including the Rochester International Airport will be maintained throughout construction. Access for emergency vehicles will be maintained throughout construction. The method of Contractor Selection has not been Determined at this time.
Final Planning
Roads / Highways
$9,700,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 22, 2025
Brook Ave, New York, NY
Related To This Project
New York, NY
Bid Date: Mar 10 2025
New York, NY
Bid Date: Mar 20 2025
New York, NY
Bid Date: Mar 18 2025
New York, NY
--
New York, NY
Bid Date: Apr 01 2025
New York, NY
Bid Date: Mar 31 2025
New York, NY
Bid Date: May 22 2025
New York, NY
Bid Date: Apr 01 2025
New York, NY
--
New York, NY
Bid Date: Mar 10 2025
New York, NY
--
New York, NY
Bid Date: Mar 10 2025
New York, NY
Bid Date: May 01 2025
New York, NY
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
