BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 25, 2025 at 8:00 PM

Updated May 2, 2025

Renovation of an educational facility in Logan, Utah. Completed plans call for the renovation of a educational facility.

Campus-Wide Classroom Upgrades Summer 2025 (FY26) Project Description/Base Bid: The project is for a remodel of up to 11 existing classrooms at various locations around campus. The classrooms are listed below with a general summary of the work to be performed in each room. HPER 114A: New lighting, saw-cut concrete slab to add conduit pathways, patch ceiling, patch carpet as needed, new whiteboards, new paint. BNR 278: Remove existing VCT flooring, new carpet, remove and reinstall teaching console. GEOL 405: New lighting, ceiling repair, AV/IT pathways, new carpet, drywall patching, new paint. NFS 248A: New lighting, new ceiling tiles, AV/IT pathways, new carpet, drywall patching, new paint, new whiteboards. Old Main 227: Remove existing teaching console, patch carpet, patch drywall, patch wood trim at wall and window. Old Main 301: New lighting, ceiling and wall drywall repair, new carpet, new paint. Old Main 326: New lighting, AV/IT pathways, new carpet, drywall repair, new paint. NFS 201: New lighting, AV/IT pathways, patch existing drywall, new drywall, new carpet, new paint, new whiteboard. NFS 202: New lighting, replace fixed table countertops, patch drywall, new ceiling tiles, new carpet, new paint. FAV 262 and 264: New lighting, AV/IT pathways, patch drywall, new carpet, new paint. Liquidated Damages: $500/day A bid bond properly signed by the contractor and a qualified surety, on the AIA Document A310 –2010 Bid Bond, or equivalent, in the amount of 5% of the bid, shall accompany the bid submission. USU FPD&C will provide the contract (Contractor Agreement) for this project to the successful bidder. The contract time will be as indicated in the bid. The successful bidder, simultaneously with the execution of the Contract Agreement, will be required to furnish a performance bond on the AIA Document A312 – 2010 Performance or equivalent. These fully executed/signed bonds are to be emailed to Amanda.thomson@usu.edu. The performance bonds shall be for an amount equal to one hundred percent (100%) of the contract sum and secured from a company that meets the requirements specified in the requisite forms. Any bonding requirements for subcontractors will be specified in the Supplementary General Conditions. USU FPD&C reserves the right to reject any or all Bids. A Cashier’s Check Cannot Be Used as a Substitute for a Bid Bond. Project Budgets up to $3.5M Questions Deadline Thursday, APRIL 24, 2025 3:00 PM amanda.thomson@usu.edu PROJECT DESCRIPTION Contact Information: o Project Specific Questions: amanda.thomson@usu.edu USU Project Manager: Amanda Thomson-Maughan | 435-797-0619 | amanda.thomson@usu.edu Joe Beck | 435-797-1089 | joe.beck@@usu.edu Project Description/Base Bid: The project is for a remodel of up to 11 existing classrooms at various locations around campus. The classrooms are listed below with a general summary of the work to be performed in each room. HPER 114A: New lighting, saw-cut concrete slab to add conduit pathways, patch ceiling, patch carpet as needed, new whiteboards, new paint. BNR 278: Remove existing VCT flooring, new carpet, remove and reinstall teaching console. GEOL 405: New lighting, ceiling repair, AV/IT pathways, new carpet, drywall patching, new paint. NFS 248A: New lighting, new ceiling tiles, AV/IT pathways, new carpet, drywall patching, new paint, new whiteboards. Old Main 227: Remove existing teaching console, patch carpet, patch drywall, patch wood trim at wall and window. Old Main 301: New lighting, ceiling and wall drywall repair, new carpet, new paint. Old Main 326: New lighting, AV/IT pathways, new carpet, drywall repair, new paint. NFS 201: New lighting, AV/IT pathways, patch existing drywall, new drywall, new carpet, new paint, new whiteboard. NFS 202: New lighting, replace fixed table countertops, patch drywall, new ceiling tiles, new carpet, new paint. FAV 262 and 264: New lighting, AV/IT pathways, patch drywall, new carpet, new paint. Project Schedule: The project will be contracted soon after bid award and is expected to be completed by 8/15/2025. Construction Cost Estimate: $215,000 Liquidated Damages: $500/day Tax Exempt: Yes

Post-Bid

Educational

$215,000.00

Public - State/Provincial

Renovation

31

5

30

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
42
Bidding Soon
671
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2025

July 1, 2025

Project location map

Old Main Hill, Logan, UT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.