BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 18, 2025 at 8:00 PM

Updated April 19, 2025

Renovation of a mixed-use development in Leawood, Kansas. Completed plans call for the renovation of a educational facility.

Description of the Work: The Work includes, but is not necessarily limited to the following: PART A - Flooring Base Bid: Bluejacket-Flint, Brookridge, Overland Park, and Sunflower Elementary Schools and SM South High School Flooring demolition includes removal of existing flooring and resilient base as noted at all locations shown on the drawings and prep/repair floor slabs - including crack repair as occurs - to receive new flooring. The project also consists of new walk-off carpet tile, new rubber tile flooring, new resilient base, and various new flooring transitions. Some touch-up painting as required is included in the scope. Alternate #1: Shawnee Mission West High School Flooring demolition includes removal of existing flooring at all locations shown on the drawings and prep/repair floor slabs - including crack repair as occurs - to receive new flooring. The project also consists of new walk-off carpet tile, new rubber tile flooring, and new resilient base. PART B - Ceilings Base Bid: Shawnee Mission South and Shawnee Mission West High Schools Ceiling demolition includes removal of existing suspended acoustical ceiling systems and light fixtures, and salvage of other MEP items in ceilings at locations shown on the drawings. Contractor to coordinate removal of remaining components of existing 12x12 suspended acoustical ceiling systems following abatement of said ceiling systems by separate owner-engaged contractor. The project also consists of new 24x24 suspended acoustical ceilings systems, reinstallation of salvaged MEP items in new ceilings, and coordination of locations and installation of new light fixtures under separate, concurrent lighting replacement project. Some touch-up painting as required is included in the scope. Note: A bid form is invalid if it has not been received by the time, date, and at the location designated for receipt as specified in this Invitation to Bid. All Flooring and Ceiling work at Bluejacket-Flint, Brookridge, Overland Park, and Sunflower Elementary Schools and SM South and SM West High Schools Base and Alternate#1 Bids All Areas Start Date 30 May 2025 Substantial Completion Date 18 July 2025 Final Completion Date 30 July 2025 Definitions for Substantial Completion, Final Completion, and terms of Liquidated Damages are identified in Section 011000 Summary of Work. Bid Security: In the amount of five percent (5%) of the Bid must accompany each Bid in accordance with the Instructions to Bidders.

Bid Results

Educational

Public - City

Renovation

58

10

35

5

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
164
Active Projects
74
Bidding Soon
1,177
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.