EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 12, 2025 at 8:00 PM

Updated October 1, 2024

Site work and paving for a civil project in Fremont, California. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Question Deadline 03/05/2025 at 2:00 PM PT Bidders must submit any inquiry under this Section by 2:0Title* 2025 Pavement Rehabilitation 52 characters remaining Lega0 p.m. at least 4 Working Days before the Bid Deadline. The Project is located at various citywide locations, and consists of the following work: Furnishing and maintaining traffic control; protecting or adjusting utility facilities, removing asphalt concrete roadway surfacing by grinding and excavating; performing hot mix asphalt base repairs; replacing traffic signal detector loops and related facilities; sealing pavement cracks; placing pavement fabric, placing hot mix asphalt overlays, placement of roadside signs; applying traffic stripes, pavement markings, and reflective pavement markers; and other related work. Time for Completion. The planned timeframe for commencement and completion of construction of the Project is: 85 working days. Estimated Project Cost. The estimated construction cost, or construction cost range, for the Project is $3,400,000. This estimate serves only as a guideline to bidders of the scope of the Work and the Project. No bidder, including the successful bidder, is entitled to make any claim against City based on inaccuracy of the estimated cost or range of cost of the Work or the Project. the Bid Proposal must be accompanied by bid security of ten percent of the maximum bid amount, in the form of a cashier's or certified check made payable to City, or a bid bond executed by a surety licensed to do business in the State of California on the Bid Bond form included with the Contract Documents. The bid security must guarantee that, upon award of the bid, the successful bidder will execute the Contract and submit the payment and performance bonds, the insurance certificates, and the other documentation required by the Contract Documents, within ten days after City's issuance of the Notice of Award Minimum Wage. This Contract may be subject to the City Minimum Wage Ordinance, codified in Fremont Municipal Code Chapter 5.30. Contractor represents it has read and understands the City's minimum wage requirements and agrees to fully comply with the ordinance. Contractor shall promptly provide any documents and information required by City to verify compliance. Contractor shall include all applicable minimum wage requirements in all subcontractor contracts and require subcontractors to comply with the requirements. If federal, state, and local minimum wage laws apply to this Contract, Contractor shall comply with the highest rate of pay applicable. Contractor's violation of the City's Minimum Wage Ordinance constitutes a material breach of Contract for which the City may pursue all available legal and equitable remedies, including termination. For more information on the City's minimum wage requirements, please refer to the City of Fremont Minimum Wage Flyer published in the City's website and updated annually. Performance and Payment Bonds. The successful bidder will be required to provide performance and payment bonds, each for 100% of the Contract Price

Post-Bid

Roads / Highways

$3,400,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

12

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
215
Active Projects
101
Bidding Soon
1,799
All Active Projects
820
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 11, 2025

May 12, 2025

img_map_placeholder

Multiple Locations, Fremont, CA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2025 Pavement Rehabilitation

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.