BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 31, 2025 at 8:00 PM

Updated April 1, 2025

Renovation of a conference / convention center in N Wildwood, New Jersey. Completed plans call for the renovation of a conference / convention center.

The Wildwoods Convention Center that sealed bids for Cooling Tower Bids shall be enclosed in sealed envelopes bearing the name and address of the bidder with the notation: Attention MICHAELA LABOUNTY: Bid for Cooling Tower A Bid Bond Equal to 10% of the Amount of the Bid but Not in Excess of $20,000 is Required to Ensure the Signing of a Contract if a Contract Is Offered. A Concent of Surety is Required to Assure That if a Contract is Awarded, the Insurance Company Will Provide a Performance Bond. Question Deadline 03/03/2025 Such request shall be in writing, addressed to the Authoritys representative Scope of work Cooling Tower replacement -Replacement tower must be 2-cell BAC XES3E-1222-10N or equivalent -Turn off both 19XR chillers -Disconnect all existing cooling tower piping -Disconnect existing electrical components -Remove and dispose of all electrical raceways and wiring back to the electrical trough -Bidder to hire roofer to expose roofing for new steel dunnage post supports -Using a crane, remove and dispose of exiting cooling tower -Remove and dispose of existing steel dunnage -Furnish and install new hot dipped galvanized steel dunnage post -Set new cooling tower in place onto new steel dunnage -Bidder to hire roofer to seal roofing after new steel dunnage post are installed -Install all field installed accessories on the cooling tower -Adapt and reconnect all existing piping to connect the new cooling towers -Remove and replace two (2) existing actuate butterfly valves; Valves included in pricing -Furnish and install new raceway and wiring from trough to new cooling tower -Remove and replace two (2) existing NEMA 1 VFD's or equivalent. -Remove and replace two (2) existing pipe supports -Remove and replace all exterior piping heat trace -Remove and replace all exterior insulation -Integrate controls for the two (2) new NEMA 1 VFD's or equivalent. -Perform start-up on cooling tower -Start up both 19XR chillers

Award

Conference / Convention Centers

$899,231.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
282
Active Projects
94
Bidding Soon
1,857
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2025

April 7, 2025

Project location map

To Be Determined, N Wildwood, NJ

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.