EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 21, 2025 at 7:00 PM

Updated October 1, 2024

Renovation of a multi-residential development in Toronto, Ontario. Completed plans call for the renovation of a multi-residential development.

The following list must be part of the Contractor's Scope of Work. However this list is to be used as a minimum guide and does not alleviate the Contractor of the responsibility to also carry out, in addition, other work according to the conventional good and current trade practices. 1. The Alex Park Phase 2A Site 3 & 16 townhouse project comprises of twenty-one townhouses. Five of the townhouses are through-units (Site 3) and Sixteen of the townhouses are back-to-back units (Site 16). The design of the twenty-one townhouses is targeting Passive House Institute US (PHIUS+) 2018 certification. The extent of this Contract is bounded by the entire boundaries of both Site 3 and Site 16 where the owner is Toronto Community Housing corporation. 2. This scope of work will form part of Toronto Community Housing Corporation form of Contract Agreement, which is attached in Schedule F1 & F2. 3. The Contractor acknowledges that the plans and specifications are in some respects not complete. The Contractor agrees that it will perform all work related to the supply & install of all Painting work in accordance with the spirit and intent of these plans and specifications and to conventional and good trade practices, at no extra charge, even if not specifically reflected in the Scopes, Drawings or Specifications. The Contractor shall also fulfill all requirements of the Ontario Building Code and of all authorities having jurisdiction, at no expense to the Owner. Furthermore, the Contractor acknowledges the Owner's intent to pursue PHIUS+ certification and will make commercial best efforts to assist in this regard on all relevant requirements. To that end, the Contractor acknowledges that the buildings will be subject to multiple tests and reviews by the PHIUS verifier. Refer to PHIUS Verifier Workplan (Attached as Schedule H for detailed list of testing) 4. This Contractor shall be responsible for completing the work for the Contract Price without additional cost to the Owner, notwithstanding any errors, omissions, or defects in the Contract Documents. The Contractor shall review the Plans, Specifications, Drawings, and related documentation and shall promptly report to the Construction Manager any error, inconsistency, or omission that the Contractor may discover. 5. The Contractor shall provide all labour, materials, supervision, tools, tackle, plant, equipment, transport, runways, planks, scaffolding, taxes, insurance, permits, inspection fees, etc necessary to carry out and complete this Contractor's work to the full extent of the Drawings, Reports, Specifications, and this Scope of Work. 6. By Submitting the bid, this Contractor will be held and has confirmed that it has visited, inspected and carefully examined the complete existing site conditions upon which the work is being performed, the extent of work and complete site logistics, including site hoarding and access/ egress gates. Contractor to refer to the overall Architectural context plan A001 for reference. This also includes the acknowledgement of surrounding streets (and one-way streets), lane restrictions and is aware of the existing conditions and difficulties that may Question Acceptance Deadline: 2025/03/13 04:00:00 PM EDT Official bid documents must be obtained from www.merx.com . * The project value listed reflects the total project estimate.

Sub-Bidding

Multi-Residential

$60,000,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Finish Carpentry, Architectural Woodwork, Wood Stairs and Railings
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting

Find More Local Projects

Within 75 Miles of This Project
322
Active Projects
201
Bidding Soon
2,779
All Active Projects
1,323
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 25, 2025

April 28, 2025

img_map_placeholder

593 Dundas St W, Toronto, ON

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

RFP Contractor - Alexandra Park Phase 2A- Site 3 & 16 - Painting (TCHC)

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.