Site work and paving for a road / highway in Andover, Vermont. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Paving multiple segments of road within the Town of Grafton ESTIMATED TIME PERIOD FOR CONTRACT: All work required herein must take place between May 15, 2025, and August 15, 2025. Location #1: Paving TH#3 - Route 35/Chester Road beginning at the intersection of Wright Orchard Road traveling north 5,000' +/- X 22' X 3". The above-described section will consist of shim and overlay. The contractor shall mill the 5,000' +/- X 22' X 3" and then shim the existing road 1 inch with type IV hot mix to regain crown and shed water and to fill in ruts at the discretion of the contractor. A top course of 2 inches shall be laid with type III hot mix compacted. This project requires Tack Coat prior to paving. Rubber tire roller and two steel drum rollers are required for the job. The beginning and end of the project need to have joints ground. Adequate transitions to match intersecting roadways and driveways are required. All paved areas must be 22 feet side to side to conform to the State of Vermont Standards. The contractor is responsible for flaggers and any other traffic control necessary in accordance with the State of Vermont Agency of Transportation and Manual on Uniform Traffic Control Devices. Location #2: Paving a portion of TH#47 - Pleasant Street for 792' +/- X 22' X 2". The above-described section will consist of shim and overlay. The contractor shall mill the 792' +/- X 22' X 2" and then shim the existing road 1 inch with type IV hot mix to regain crown and shed water and to fill in ruts at the discretion of the contractor. A top course of 1 inch shall be laid with type III hot mix compacted. The project requires Tack Coat prior to paving. Rubber tire roller and two steel drum rollers are required for the job. The beginning and end of the project need to have joints ground. Adequate transitions to match intersecting roadways and driveways are required. All paved areas must be 22 feet side to side to conform to the State of Vermont Standards. The contractor is responsible for flaggers and any other traffic control necessary in accordance with the State of Vermont Agency of Transportation and Manual on Uniform Traffic Control Devices. Location #3: Paving a portion of TH#48 - School Street for 581' +/- X 22' X 2". The above-described section will consist of shim and overlay. The contractor shall mill the 581' +/- X 22' X 2" and then shim the existing road 1 inch with type IV hot mix to regain crown and shed water and to fill in ruts at the discretion of the contractor. A top course of 1 inch shall be laid with type III hot mix compacted. The project requires Tack Coat prior to paving. Rubber tire roller and two steel drum rollers are required for the job. The beginning and end of the project need to have joints ground. Adequate transitions to match intersecting roadways and driveways are required. All paved areas must be 22 feet side to side to conform to the State of Vermont Standards. The contractor is responsible for flaggers and any other traffic control necessary in accordance with the State of Vermont Agency of Transportation and Manual on Uniform Traffic Control Devices. Location #4: Paving a portion of TH#6 - Hinkley Brook Road from the intersection with Middletown Road going west to the intersection with Fire Pond Road, 425' +/- X 22' X 3". The above-described section will consist of shim and overlay. The contractor shall mill the 425' +/- X 22' X 3" and then shim the existing road 1 inch with type IV hot mix to regain crown and shed water and to fill in ruts at the discretion of the contractor. A top course of 2 inches shall be laid with type III hot mix compacted. The project requires Tack Coat prior to paving. Rubber tire roller and two steel drum rollers are required for the job. The beginning and end of the project need to have joints ground. Adequate transitions to match intersecting roadways and driveways are required. All paved areas must be 22 feet side to side to conform to the State of Vermont Standards. The contractor is responsible for flaggers and any other traffic control necessary in accordance with the State of Vermont Agency of Transportation and Manual on Uniform Traffic Control Devices.
Award
Roads / Highways
$295,001.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 17, 2025
May 15, 2025
Multiple Locations, Andover, VT
Related To This Project
Andover, VT
Bid Date: Mar 03 2025
Andover, VT
Bid Date: Mar 03 2025
Andover, VT
--
Andover, VT
Bid Date: Sep 12 2025
Andover, VT
--
Andover, VT
Bid Date: Mar 14 2024
Andover, VT
Bid Date: Dec 14 2023
Andover, VT
Bid Date: Jan 21 2022
Andover, VT
Bid Date: Jan 14 2022
Andover, VT
Bid Date: Jun 15 2023
Berlin, VT
Bid Date: Feb 22 2025
Tunbridge, VT
Bid Date: Mar 10 2025
Grand Isle, VT
Bid Date: Feb 28 2025
Montpelier, VT
Bid Date: Mar 14 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.