Site work and paving for a road / highway in Andover, Vermont. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Paving multiple segments of road within the Town of Grafton ESTIMATED TIME PERIOD FOR CONTRACT: All work required herein must take place between May 15, 2025, and August 15, 2025. Location #1: Paving TH#3 - Route 35/Chester Road beginning at the intersection of Wright Orchard Road traveling north 5,000' +/- X 22' X 3". The above-described section will consist of shim and overlay. The contractor shall mill the 5,000' +/- X 22' X 3" and then shim the existing road 1 inch with type IV hot mix to regain crown and shed water and to fill in ruts at the discretion of the contractor. A top course of 2 inches shall be laid with type III hot mix compacted. This project requires Tack Coat prior to paving. Rubber tire roller and two steel drum rollers are required for the job. The beginning and end of the project need to have joints ground. Adequate transitions to match intersecting roadways and driveways are required. All paved areas must be 22 feet side to side to conform to the State of Vermont Standards. The contractor is responsible for flaggers and any other traffic control necessary in accordance with the State of Vermont Agency of Transportation and Manual on Uniform Traffic Control Devices. Location #2: Paving a portion of TH#47 - Pleasant Street for 792' +/- X 22' X 2". The above-described section will consist of shim and overlay. The contractor shall mill the 792' +/- X 22' X 2" and then shim the existing road 1 inch with type IV hot mix to regain crown and shed water and to fill in ruts at the discretion of the contractor. A top course of 1 inch shall be laid with type III hot mix compacted. The project requires Tack Coat prior to paving. Rubber tire roller and two steel drum rollers are required for the job. The beginning and end of the project need to have joints ground. Adequate transitions to match intersecting roadways and driveways are required. All paved areas must be 22 feet side to side to conform to the State of Vermont Standards. The contractor is responsible for flaggers and any other traffic control necessary in accordance with the State of Vermont Agency of Transportation and Manual on Uniform Traffic Control Devices. Location #3: Paving a portion of TH#48 - School Street for 581' +/- X 22' X 2". The above-described section will consist of shim and overlay. The contractor shall mill the 581' +/- X 22' X 2" and then shim the existing road 1 inch with type IV hot mix to regain crown and shed water and to fill in ruts at the discretion of the contractor. A top course of 1 inch shall be laid with type III hot mix compacted. The project requires Tack Coat prior to paving. Rubber tire roller and two steel drum rollers are required for the job. The beginning and end of the project need to have joints ground. Adequate transitions to match intersecting roadways and driveways are required. All paved areas must be 22 feet side to side to conform to the State of Vermont Standards. The contractor is responsible for flaggers and any other traffic control necessary in accordance with the State of Vermont Agency of Transportation and Manual on Uniform Traffic Control Devices. Location #4: Paving a portion of TH#6 - Hinkley Brook Road from the intersection with Middletown Road going west to the intersection with Fire Pond Road, 425' +/- X 22' X 3". The above-described section will consist of shim and overlay. The contractor shall mill the 425' +/- X 22' X 3" and then shim the existing road 1 inch with type IV hot mix to regain crown and shed water and to fill in ruts at the discretion of the contractor. A top course of 2 inches shall be laid with type III hot mix compacted. The project requires Tack Coat prior to paving. Rubber tire roller and two steel drum rollers are required for the job. The beginning and end of the project need to have joints ground. Adequate transitions to match intersecting roadways and driveways are required. All paved areas must be 22 feet side to side to conform to the State of Vermont Standards. The contractor is responsible for flaggers and any other traffic control necessary in accordance with the State of Vermont Agency of Transportation and Manual on Uniform Traffic Control Devices.

Award

Roads / Highways

$295,001.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
377
Active Projects
170
Bidding Soon
2,500
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2025

May 15, 2025

Project location map

Multiple Locations, Andover, VT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.