Published March 27, 2025 at 8:00 PM

Updated March 28, 2025

Site work and paving for a civil project in Caldwell, Idaho. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The Project includes the following Work: Bid Schedule 1: Construction of a new reinforced concrete box culvert structure on Indian Creek at Ustick Road, to replace an existing corrugated metal culvert at that location; including excavation, creek bypass, dewatering, demolition, utility relocations, drilled piles, subgrade preparation, new cast-in-place concrete box culvert construction, backfill, and surface restoration. Bid Schedule 2: Construction of Ustick Road Widening improvements from Station 34+60 to Station 42+00. Action will be taken by the City within thirty (30) days of the opening date and the successful bidder will be required to enter into a written contract with the City within ten (10) days after Notice of Acceptance of his bid. Each bid must be accompanied by a bid bond or certified check in the amount of 5% of the total bid, which will be forfeited to the City if the bidder fails to enter into the contract. Checks of unsuccessful bidders will be returned immediately following the award of the contract or 30 days after opening, if no award is made. All contractors submitting bids are required to have a valid Idaho Public Works License and to include the number on their submitted Bid. Payment and Performance Bonds equal to the bid amount are required upon award of Contract. This work is financed entirely from City funds. Federal Davis-Bacon wage requirements do not apply. The City reserves the right to waive any informality or to reject any and all bids not in the best interest of the City. Question Submission Deadline March 18, 2025, 12:00pm SCOPE OF WORK 1. COMPLETION DATE For the purposes of the Contract Documents, the following is the Completion Date: BIDDER agrees that this project will be substantially complete 180 calendar days from NTP and fully operational within 210 calendar days from NTP. BIDDER accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the work or meet certain milestones on time. Substantial Completion: See contract documents for definition. Final Completion: See contract documents for definition. 2. MATERIAL, EQUIPMENT, AND LABOR BIDDER will furnish all material, equipment, labor, taxes, permits and all things necessary to complete the Scope of this project in place for the UNIT PRICES as Bid, being aware that the total amount of compensation will be determined from the actual quantities completed in place, computed to neat lines as detailed.

Award

Bridges / Tunnels

$3,500,000.00

Public - City

Paving, Site Work

61

25

7

3

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
49
Active Projects
25
Bidding Soon
321
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 25, 2025

May 26, 2025

Project location map

Ustick Rd, Caldwell, ID

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.