Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 24, 2025 at 8:00 PM
Updated October 1, 2024
Site work and paving for a civil project in Caldwell, Idaho. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
The Project includes the following Work: Bid Schedule 1: Construction of a new reinforced concrete box culvert structure on Indian Creek at Ustick Road, to replace an existing corrugated metal culvert at that location; including excavation, creek bypass, dewatering, demolition, utility relocations, drilled piles, subgrade preparation, new cast-in-place concrete box culvert construction, backfill, and surface restoration. Bid Schedule 2: Construction of Ustick Road Widening improvements from Station 34+60 to Station 42+00. Action will be taken by the City within thirty (30) days of the opening date and the successful bidder will be required to enter into a written contract with the City within ten (10) days after Notice of Acceptance of his bid. Each bid must be accompanied by a bid bond or certified check in the amount of 5% of the total bid, which will be forfeited to the City if the bidder fails to enter into the contract. Checks of unsuccessful bidders will be returned immediately following the award of the contract or 30 days after opening, if no award is made. All contractors submitting bids are required to have a valid Idaho Public Works License and to include the number on their submitted Bid. Payment and Performance Bonds equal to the bid amount are required upon award of Contract. This work is financed entirely from City funds. Federal Davis-Bacon wage requirements do not apply. The City reserves the right to waive any informality or to reject any and all bids not in the best interest of the City. Question Submission Deadline March 18, 2025, 12:00pm SCOPE OF WORK 1. COMPLETION DATE For the purposes of the Contract Documents, the following is the Completion Date: BIDDER agrees that this project will be substantially complete 180 calendar days from NTP and fully operational within 210 calendar days from NTP. BIDDER accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the work or meet certain milestones on time. Substantial Completion: See contract documents for definition. Final Completion: See contract documents for definition. 2. MATERIAL, EQUIPMENT, AND LABOR BIDDER will furnish all material, equipment, labor, taxes, permits and all things necessary to complete the Scope of this project in place for the UNIT PRICES as Bid, being aware that the total amount of compensation will be determined from the actual quantities completed in place, computed to neat lines as detailed.
Post-Bid
Bridges / Tunnels
$3,500,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 05 - Metals
Division 08 - Openings
Division 09 - Finishes
Division 10 - Specialties
Division 13 - Special Construction
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 34 - Transportation
Division 35 - Waterways and Marine Construction
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 25, 2025
May 26, 2025
Ustick Rd, Caldwell, ID
Related To This Project
Caldwell, ID
Bid Date: Mar 25 2025
Caldwell, ID
Bid Date: Mar 27 2025
Caldwell, ID
Bid Date: Apr 02 2025
Caldwell, ID
Bid Date: Apr 02 2025
Caldwell, ID
--
Caldwell, ID
Bid Date: Mar 11 2025
Caldwell, ID
Bid Date: Mar 06 2025
Caldwell, ID
Bid Date: Mar 06 2025
Caldwell, ID
Bid Date: Mar 13 2025
Caldwell, ID
Bid Date: Mar 17 2025
Caldwell, ID
Bid Date: Mar 17 2025
Caldwell, ID
Bid Date: Feb 06 2025
Caldwell, ID
Bid Date: Feb 11 2025
Caldwell, ID
Bid Date: Feb 11 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.