BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 3, 2025 at 8:00 PM

Updated October 4, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Oakley, Utah. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; and for the construction of a bridge / tunnel.

Description : Replacement and Rehabilitation - Structure County: Summit This Project Requires Using the Electronic Certified Payroll Program. See Attachment to Notice to Contractors. This is a P+t (Price + Time) Project. The Department Will Not Hold Retention on This Project. Per Utah State Code 13-8-5 (1) Prime Contractors Cannot Hold Retention. Refer to Utah Code 13-8-5 (1) for More Information. DBE Goal: 6.00% Wage Rates: Apply Engineer's Estimate: Greater than $6M but less than $10M Mandatory Prequalification Required (Qualified Health Insurance Required) Each bidder must submit an electronic bid bond from an approved surety company through the appropriate clearinghouse, as defined in the UDOT E-Bidding Guide, using UDOT's Bidding Business System or in lieu thereof, cash, certified check, or cashier's check for not less than 5% of the total amount of the bid, made payable to the Utah Department of Transportation, showing evidence of good faith and a guarantee that if awarded the contract, the bidder will execute the contract and furnish the contract bonds as required. The Right to Reject Any or All Bids is Reserved. As required, a contractor's license must be obtained from the Utah Department of Commerce to work on UDOT projects as defined from the Division of Professional Licensing. Project Plans Cannot Be Downloaded or Printed From the Website Unless Your Company is Registered With Udot. Go to Udot's Website to Register. Prequalification of bidders is required. Prior to submitting a bid, the bidder must have on file with the Utah Department of Transportation a completed and approved contractor's application for prequalification. Department processing time is 20 working days from receipt of properly executed documentation. UTDOT - Bridge Replacements at Rockport Reservoir For questions contact the UDOT Certified Payroll Specialist - Jessi McIntyre at jmcintyre@utah.gov.

Award

Bridges / Tunnels

$6,316,981.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

145

10

5

7

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
153
Active Projects
66
Bidding Soon
1,070
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 23, 2025

November 24, 2025

Project location map

Multiple Locations, Oakley, UT


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.