Published March 21, 2025 at 8:00 PM

Updated October 1, 2024

Renovation of an educational facility in Seneca, Illinois. Completed plans call for the renovation of a educational facility.

As of March 14, 2025, this project has not yet been awarded. A timeline for award has not yet been established. Removal and Replacement of Domestic Hot Water Heating System serving the 1978 Building. and additional work as indicated. Bids are requested by Seneca Township High School District No. 160, Seneca, Illinois 61360 for 2025 - Domestic Hot Water Heating System Upgrades at Seneca Township High School. Bid security in the amount of five percent (5%) of the Base Bid amount proposed, in the form of a certified check or cashier's check made payable to the Owner, or a Bid Bond, must accompany bids. Selected bidder is required to provide a satisfactory performance bond and labor & material payment bond covering the full performance of the contract. The costs of the bonds are to be included in each contractor's bid proposal. Owner reserves the right to reject any and all Bids, to waive any irregularities in the Bidding, and to award contract in Owner's best interests. Based upon a Notice to Proceed by March 20, 2025, Contractor shall substantially complete all work by AUGUST 1, 2025. Final Pay Request shall be by SEPTEMBER 1, 2025.

Award

Educational

$59,570.00

Public - City

Renovation

11

12

2

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Temporary Utilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 09 - Finishes

Division 09 - Finishes

Ceilings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Domestic Water Pumps
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, Decentralized HVAC Equipment, Decentralized Unitary HVAC Equipment, Convection Heating and Cooling Units
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Low-Voltage Electrical Distribution, Facility Electrical Power Generating and Storing Equipment, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 33 - Utilities

Division 33 - Utilities

Electrical Utilities, Utility Substations, Communications Utilities, Communications Distribution
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Lifting Devices, Clamps

Find More Local Projects

Within 75 Miles of This Project
314
Active Projects
206
Bidding Soon
2,190
All Active Projects
1,091
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 11, 2025

March 20, 2025

img_map_placeholder

307 E Scott St, Seneca, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Domestic Hot Water Heating System Upgrades

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.