BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 9, 2025 at 7:00 PM

Updated March 10, 2025

Renovation of a mixed-use development in El Campo, Texas. Completed plans call for the renovation of a educational facility.

AA - Advertisement for Sealed Proposals NEW CANEY ISD ADVERTISEMENT FOR SEALED PROPOSALS Learning Center Replacement Campus and Re-Roof Bid Package A Proposal Security in the amount of ten percent (10%) of the proposal amount is required. Project includes: Scope of work will include the renovation of an existing pre-engineered metal building to accommodate the new Learning Center campus. Full interior and exterior envelope with new building systems and supplemental plumbing/electrical. Additionally, this package also includes the complete re-roof of both Pine Valley and White Oak Middle School(s). All addenda will be issued directly from DLR Group by request or through the distribution list of current plan holders. A Contract may be awarded to a proposer per the following criteria: 1. The Offeror's submitted base proposal-50%; 2.The Offeror's experience and reputation-15%; 3.The quality of the Offeror's goods or services-15%; 4.The Offeror's safety record-2%; 5.The Offeror's proposed personnel-5%; 6. Whether the Offeror's financial capability is appropriate to the size and scope of the project-5% 7. Offeror's ability to complete project on time-5%; 8. Offeror's performance in responding to warranty - 3%. The District reserves the right to reject any and all proposals, and waive any informalities, discrepancies or minor irregularities regarding the proposals. Re-Roof Bid Package: White Oak Middle School at 24161 Briar Berry Lane, Porter, TX. 77365 Pine Valley Middle School at 22784 US 59S, Porter, TX 77365 Any explanation desired by a prospective proposer regarding the meaning or interpretation of the Procurement Documents must be requested in writing and with sufficient time allowed (a minimum of ten (10) calendar days before the date set to receive proposals) for a response to reach prospective proposers before the submission of their proposals. Any NCISD interpretations, corrections, and/or changes to the procurement or construction documents will be in the form of an addendum. Interpretations, corrections and changes of the Procurement Documents made in any other manner will not be binding, and Proposers shall not rely upon them. All such addenda shall be posted where the original procurement documents were placed. Receipt of any addenda issued by NCISD shall be acknowledged by the proposer with the proposal submission.

Post-Bid

Educational

$11,365,000.00

Public - City

Renovation

117

26

98

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
331
Active Projects
179
Bidding Soon
3,135
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2025

May 5, 2025

Project location map

22784 US-59, El Campo, TX

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.