Published March 19, 2025 at 8:00 PM

Updated October 1, 2024

Renovation of a service station / car wash facility in Niagara Falls, New York. Completed plans call for the renovation of a service station / car wash facility.

If email is not an option for the bidder an alternate address will be provided upon written request to a designated contact. The Contract D number should be clearly marked in the subject line of your email, along with the words "BID SUBMISSION". Each bid must be prepared and submitted in accordance with the Instructions to Bidders and must be accompanied by a scanned Bid Security in the form of a certified check, bank check, or bid bond in the amount of $9,720.40: $9,720.40 Nine thousand seven hundred twenty dollars and forty cents. Note: The original hardcopy bid bonds for the two lowest bidders must be postmarked and sent via certified mail within 48 hours of receiving the bid summary from the Office. General Construction Contract Installation two new electric vehicle charging stations. Work will involve adding circuits in the existing electrical panel inside the office, installing new underground conduit and pulling new electrical wire through from panel to charging stations, pouring two concrete pads for the new charging stations and programming the new stations for use. Engineer's Estimate range is $165,246.74 $233,569.11 MINORITY AND WOMEN-OWNED BUSINESS ENTERPRISE PARTICIPATION GOALS (MWBE) The following goals for MWBE participation on this project have been established at: Minority Owned Business Enterprise (MBE) 21% Women Owned Business Enterprise (WBE) 9% SERVICE-DISABLED VETERAN OWNED BUSINESS (SDVOB) GOALS The following goals for SDVOB participation on this project have been established at:Service-Disabled Veteran Owned Business 6% PUBLIC BUILDING LAW _ 8(6) Pursuant to Public Building Law _ 8(6), any contracts over $5,000 for the work of construction, reconstruction, alteration, repair, or improvement of any State building, a responsible and reliable NYS-certified Minority or Women-Owned Business Enterprise that submits a bid within ten percent of the lowest bid will be deemed the apparent low bidder provided that the bid is $1,628,283 or less (maximum amount has been adjusted for inflation effective January 1, 2024). If more than one responsible and reliable MWBE firm meets the requirements, the MWBE firm with lowest bid will be deemed the apparent low bidder. PROJECT COMPLETION The completion date for this project is 180 Days after agreement has been approved by the NYS Comptroller's Office. Project Specific Liquidated Damages (Refer to Article 14.10 of the General Conditions). $1,000 per day. In accordance with State Finance Law, Section 139-j, the following agency staff have been designated as contacts for this contract: James A. Pusateri 716-523-5954 James.Pusateri@parks.ny.gov Carissa Hartson 716-265-1655 Carissa.Hartson@parks.ny.gov John C. Honan 716-299-0811 John.Honan@parks.ny.gov Carley McMullen 716-278-1770 Carley.McMullen@parks.ny.gov Please note that contacting any other agency staff regarding this contract may be a violation of State Finance Law, Section 139-j, resulting in a determination of contractor non-responsibility. CONTRACTOR REGISTRY REQUIREMENT in December 2024 Newly established subsection 220-i to NYS Labor Law Article 8 requires contractors and subcontractors to register with the Bureau of Public Work and Prevailing Wage Enforcement for public work. This registration must be completed prior to bidding on public work projects covered under Article 8 of Labor Law. The effective date of the registration requirement is December 30, 2024. No contractors or subcontractors are required to register prior to that date; however, after the effective date, bidders may be found to be non-responsive if they fail to include a digital copy of their registration certificate with their bid submission, and registration number on the project bid form. The apparent low bidder will additionally be held responsible to provide copies of registration certificates for all subcontractors on their approved Utilization Plan before the contract is submitted to the Office of the Comptroller for approval. Please refer to this website for information website. The registration login page is found here: Log In - Management System for Protecting Workers' Rights EXECUTIVE ORDER No. 16 The successful bidder will be required to furnish an Executive Order No. 16 certification form prior to contract award. The Executive Order can be found here website. ONDS The successful bidder will be required to furnish a Performance Bond and a Labor and Material Bond/Payment Bond in the statutory form of public bonds required by Sections 136 and 137 of the State Finance Law, each for 100% of the amount of the Contract. Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 21% Women Owned Sub-Contracting Goal: 9% Service-Disabled Veteran-Owned Business Contracting Goal: 6% All Requests For Information (RFIs) are due by: 12:00 P.M. on February 26, 2025 OPRHP will provide a written response to all substantive questions and requests for clarification *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Service Station / Car Wash

$141,805.00

Public - State/Provincial

Renovation

5

19

20

4

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Contingency Allowances, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Manufacturer Qualifications, Temporary Facilities and Controls, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Project Record Documents, Spare Parts
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Site Remediation, Chemical Decontamination
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metals, Common Work Results for Metals
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 09 - Finishes

Division 09 - Finishes

Ceilings, Painting and Coating, High-Performance Coatings
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Vehicle Service Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Commissioning of Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Facility Electrical Power Generating and Storing Equipment, Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists

Find More Local Projects

Within 75 Miles of This Project
349
Active Projects
208
Bidding Soon
3,004
All Active Projects
1,398
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2025

April 17, 2025

img_map_placeholder

3180 De Veaux Woods Dr E, Niagara Falls, NY


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Electric Vehicle Charging Station Installation DeVeaux Woods State Park

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.