EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 14, 2025 at 8:00 PM

Updated October 1, 2024

Renovation of a military facility in Patrick Air Force Base, Florida. Completed plans call for the renovation of a military facility.

**An Amendment 2 has been made to this IFB. The purpose of this amendment is to amend Attachment 8 - Site Visit Rules of Engagement, with the following changes: 1) Attendees not required a badge for access to pre-proposal site visit. 2) The site visit will be held on 24 March, 2025 at 10:00 AM at South Patrick Chapel (Bldg. 3659), 84 Harrier Avenue, Patrick AFB, FL 32927. You can park your vehicle at the Chapel parking lot. All other terms and conditions remain the same. *An amendment has been made to this IFB. The purpose of this amendment is to: 1. Adjust box 13d. from 120 calendar days to 173 calendar days. 2. Adjust the time in box 13a to 9:00am. 3. Amend Atch 10 - ODS All other terms and conditions remain the same. Work to be performed under this project consists of providing all labor, equipment and materials to replace the 60-ton TRANE R-22 Chiller with a TRANE R-410A Chiller. The condenser and evaporator of the new chiller shall be of shell and tube design. The cooling tower shall be replaced with a Tower Tech cooling tower. Both hot and chilled water pumps need to be replaced, along with all new electrical panels. Controls are to be upgraded to PSFB EMCS standards. All piping in the Mechanical Rooms, with the exception of the piping to the boiler, is to be replaced. All the AHUs in the facility needs to be replaced as well. Also, there are 12 fan coil units throughout the facility that are deteriorated and need to be replaced. Each of the fan coil units should be individually controlled with the own wall stat. Touch-up paint walls, replace any damaged gypsum board, replace any damaged wainscot and replace any damaged carpeting, as conditions require during equipment replacement. Design shall include a provision for the Contractor to provide a portable chiller during construction. All work shall comply with State of Florida Building Codes and Wing Facility Excellence guidelines. Period of Performance: 180 calendar days, to begin 10 days after issuance of the Notice to Proceed (NTP). NTP to be issued within 30 days after award. This is a solicitation for a Firm-Fixed-Price Construction Contract for Space Launch Delta 45, Patrick Space Force Base, FL. Notice to Offerors: Funds are not presently available for this project. The Governments obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer. The Government reserves the right to cancel this invitation for bid, either before or after the closing date. In the event the Government cancels this invitation of bid, the Government has no obligation to reimburse an offeror for any costs. Point of Contacts: Contracting Officer: Abigail Lynagh Telephone: (321) 494-1913 E-mail: abigail.lynagh@spaceforce.mil Contracting Officer: Patricia A. Bates, NH-3 Telephone: (321) 494-7121 E-mail: patricia.bates@spaceforce.mil Contract Specialist: Jennifer Marrs Telephone: (321) 494-3544 E-mail: jennifer.marrs.3@spaceforce.mil All questions should be submitted using the Question & Answer Template, to ALL points of Contacts listed above and must be received no later than March 26, 2025 @ 2:00 PM Eastern Standard Time (EST). Questions received after this date may not be answered. All questions with answers will be posted to https://sam.gov/ as an amendment to the solicitation announcement. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Sub-Bidding

Military

$1,000,000.00

Public - Federal

Renovation

27

14

36

4

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Assurance, Field Samples, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Construction Facilities, Temporary Construction, Temporary Controls, Temporary Environmental Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Facility Remediation, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Concrete Curing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Finish Carpentry, Millwork, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Thermal Insulation, Exterior Insulation and Finish Systems, Roofing and Siding Panels, Siding, Fire and Smoke Protection, Firestopping, Joint Protection, Expansion Control
Division 08 - Openings

Division 08 - Openings

Windows, Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Tiling, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Interior Specialties, Partitions, Storage Specialties, Lockers, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Mercantile and Service Equipment, Office Equipment, Computers
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts, Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Duct Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Refrigerant Piping, Refrigerants, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Turning Vanes, Flexible Connectors, HVAC Fans, Air Outlets and Inlets, Central Cooling Equipment, Packaged Water Chillers, Rotary-Screw Water Chillers, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Fan Coil Units, Radiators
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Low-Voltage Circuit Protective Devices, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Cement and Concrete for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Fill, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Hoists, Lifting Devices, Clamps, Hooks, Lifts
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors

Find More Local Projects

Within 75 Miles of This Project
158
Active Projects
78
Bidding Soon
1,206
All Active Projects
495
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2025

May 19, 2025

img_map_placeholder

To Be Determined, Patrick Air Force Base, FL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Replace Chiller AHU and Fan Coil Unit

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.