BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 17, 2025 at 8:00 PM

Updated April 18, 2025

Site work and paving for a mixed-use development in Powell, Ohio. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**Project is awarded to Strawser Paving Co., Inc. with the amount of Base Bid $1,905,677.70 Alternate 1 $71,216.10 Alternate 2 $92,243.20 Alternate 3 $287,652.40 Alternate 4 $495,825.40 Alternate 5 $89,820.40 Alternate 6 $125,042.50 Alternate 7 $49,434 Alternate 8 $48,900 All labor, material, and services necessary for the 2025 Street and Trail Maintenance Program, which includes asphalt milling and overlay, asphalt full depth pavement repairs, concrete sidewalk improvements, curb ramp improvements, spot curb replacement, continuous curb replacement, crack sealing, asphalt path improvements, pavement markings, guardrail removal and replacement, and other related items (the "Project"), as more fully described in the Contract Documents prepared by EMH&T (''Design Professional''). Direct questions about the Project to Aaron Stanford, P.E., City of Powell Engineer, at astanford@cityofpowell.us. Shipping fees are not included and shall be paid by recipient. All Bidders submitting a sealed Bid shall obtain the Bidding Documents from EMH&T. Contract Documents may be reviewed without charge during business hours at the following locations: EMH&T, 5500 New Albany Road, Columbus, Ohio 43054. City of Powell Administration Offices, 47 Hall Street, Powell, Ohio 43065. All bids must be accompanied by a Bid Guaranty in the form of either a Bid Guaranty and Contract Bond for the full amount of the bid (including all additional bids) or a certified check, cashier's check, or an irrevocable letter of credit in an amount equal to 10% of the bid (including all additional bids), as described in the Instructions to Bidders. This is a prevailing wage project. No Bidder may withdraw its bid within sixty (60) days after the bid opening. The Owner reserves the right to waive irregularities in bids, to reject any or all bids, and to conduct such investigation as necessary to determine the lowest and best bidder for each contract. The completion of work for the Base Bid shall be 150 calendar days from the Notice to Proceed. The Engineer's Estimate of cost for this work is as follows: Base Bid: $1,967,000.00 Additional Bid 1 - Grandshire Drive: Resurfacing: $84,600.00 Additional Bid 2 - Ashmoore Court: Resurfacing: $97,600.00 Additional Bid 3 - Murphy Parkway: Resurfacing: $287,600.00 Additional Bid 4 - Trail Maintenance: $495,800.00 Additional Bid 5- Additional Trail Maintenance: $94,000.00 Additional Bid 6 - Guardrail Maintenance: $125,000.00 Additional Bid 7 - Preventative Maintenance: $50,000.00

Award

Roads / Highways

$1,693,489.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
265
Active Projects
146
Bidding Soon
1,969
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 7, 2025

May 6, 2025

Project location map

Multiple Locations, Powell, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.