BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 3, 2025 at 7:00 PM

Updated March 12, 2025

Site work and paving for a road / highway in Waterbury, Connecticut. Completed plans call for site work for a road / highway; and for paving for a road / highway.

It is the intent of the City for the Successful Proposer to furnish all labor, services, materials, tools, equipment, transportation and incidentals necessary to execute and properly finish the Project, as detailed and described herein. The City will be milling and paving roads in various parts of the City along with incidental related work including minor drainage improvements, replacement of traffic signal loop detectors on Colonial Avenue, concrete sidewalks and ADA compliant pedestrian ramps. In addition, Western Hills Golf If you have any questions, please contact: Maureen McCauley It is the intent of the City for the Successful Proposer to furnish all labor, services, materials, tools, equipment, transportation and incidentals necessary to execute and properly finish the Project, as detailed and described herein. The City will be milling and paving roads in various parts of the City along with incidental related work including minor drainage improvements, replacement of traffic signal loop detectors on Colonial Avenue, concrete sidewalks and ADA compliant pedestrian ramps. In addition, Western Hills Golf Course, 600 Park Road parking lot and driveway may be milled and paved. Proposer's should be aware that the Western Hills Golf Course and associated restaurant will be open to the public during the construction period. Work shall be phased and scheduled to provide for continued regular and handicapped access during business hours. Scope of Work Summary. The scope of work for this Project involves milling the roads (approximately 151,000 square yards) and paving (approximately 22,000 tons of warm or hot-mix asphalt) and municipal parking lots identified in this Request for Proposals or as directed by the City, and incidental related work as required. Substantial Completion - November 15, 2025 ; Final completion- November 30, 2025.

Post-Bid

Roads / Highways

$750,000.00

Public - City

Paving, Site Work

4

9

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
808
Active Projects
159
Bidding Soon
6,895
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 11, 2025

April 10, 2025

Project location map

Multiple Locations, Waterbury, CT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.