Published March 15, 2025 at 8:00 PM

Updated October 1, 2024

Renovation of an educational facility in Los Angeles, California. Completed plans call for the renovation of a educational facility.

Roofing Replacement Bid security in the amount of ten (10) percent of the lump sum base bid, excluding bid items, shall accompany each bid. The District's contract bond estimate is $9,164,000.00 The contract time is 510 days DVBE (5%), SBE (25%) The furnishing of all labor, materials, equipment, services, and incidentals necessary for Work of the Roofing, at Westchester High School located at 7400 W Manchester Ave, Los Angeles, CA 90045, as set forth in the Construction Documents which include, but are not limited to, the Drawings, Addenda and Specifications. BUILDINGS: 001BON, ASSEMBLY ROOM ARCADE #6, 002BON, 003DON, 004DON, 005DON, 006DON, 007DON, 008DON, 009DON, 010DON, 011DON, 012DON, 013CON, 014CON, 015DON, 017BON, 018DON, 019DON, C0012G, X0355L, 020DON, STORAGE UNIT, 023DON, 024DON, 028BON, 029CON, 030BON, 031BON, ARCADE #1, ARCADE #2, ARCADE #3, ARCADE #4, ARCADE #5, ARCADE #7, 033COT, S0027S, S0028S, S0029S, T0005N, T0006N, DSA BUILDING #1, DSA BUILDING #4, DSA BUILDING 22013, DSA BUILDING 21839, CLASSROOM BUIDING #1, CLASSROOM BUILDING #2, CLASSROOM BUILDING #3, CLASSROOM BUILDING #4, CLASSROOM BUILDING #5 A. The presence of asbestos-containing roofing materials and lead-based paint on affected components have been determined or are assumed to exist on one or more of the buildings referred to in the scope of work. See the asbestos and lead reports for locations of these materials. CONTRACTOR shall include as part of this contract asbestos and lead abatement and lead related construction work, as required. All such work shall be performed by a subcontractor included on the current list of approved abatement contractors. The CONTRACTOR shall coordinate abatement and lead related construction of all asbestos-containing materials (ACM) and building components with lead-based paint (LBP) surfaces to be impacted by the project through the environmental consultant. This shall be done prior to any roof replacement work to ensure that no ACM and/or LBP are inadvertently disturbed. All ACM and/or LBP to be impacted by the project and requiring abatement or lead related construction work shall be clearly identified and marked by the CONTRACTOR with the assistance of the Environmental Consultant. The abatement or lead related construction work shall not commence without the approval of the Environmental Consultant. All ACM and/or LBP work shall be monitored by the Environmental Consultant. B. CONTRACTOR shall not proceed with any roof replacement work until notification is received from the Environmental Consultant that all ACM and LBP to be impacted by the project have been abated or managed, as required, and the work area is clear for normal access in accordance with the specifications. Unless otherwise noted: all roof removal and/or Asbestos/Lead abatement work shall be performed during non-school hours. C. Where the OWNER calls for reuse of existing materials, the CONTRACTOR may, at their option, remove and replace with new at no additional cost to the OWNER. D. Unless otherwise noted, eyebrows, eaves, and overhangs attached to a building listed in Section 1.01A are included in the scope of work. E. Unless otherwise noted all work on arcades, cafeterias, lunch shelters, children centers, early education centers, special education classrooms, and kindergartens are to be performed during non-school hours. F. Temporary barricades utilizing temporary chain link fence panels a minimum of 6' high and set a minimum of 10' from buildings and arcades, utilizing a double fence set up on all arcades spaced out 10 feet of each other. Stands shall be set at maximum of 12' on center. All staging areas, regardless of day or time, shall be completely enclosed with temporary chain link fencing with a minimum height of eight (6) feet. Orange snow fencing is not allowed as a barrier system. G. When removal of roofing is required for roofs higher than fifteen (15) feet, a completely enclosed trash chute is required. H. All bins, dumpsters and storage units shall be set on 2' x 2' x 3/4 " plywood minimum and care shall be taken in delivery and pick up as to not create any damage to grounds. CONTRACTOR to bear all expenses of repairs to damaged grounds. I. The contractor and all employees of the contractor shall wear photo identification while on District property. The ID shall include employee's name, contractor's name, and job classification. J. Remove and replace ALL equipment platform covers with new 22-gauge galvanized sheet metal covers matching existing in size and configuration. K. Remove and replace all insulation matching existing thickness with new polyisocyanurate with a minimum value of R7 per inch. L. Install pressure release vents on all concrete substrates per manufacturers recommendations. M. Install PVC walk pads from roof hatch to and around serviceable equipment N. Remove and replace roof hatches with all required safety access and rails as a complete system. O. Site Wide - Install dura-blocks attached to 80-mil textured PVC, install 2" round stanchion supports in place where the support curbs were removed/angle iron (must be in the same location and brace underneath if required. P. Install "Black" stenciled school address to main building per the specifications for PVC roofing. Q. Contractor shall use scheduling software such as Microsoft Project to provide a baseline schedule, monthly updates, and recovery schedules for the project. Contractor shall incorporate milestones found in the Phasing of the Work specification into the project schedule. A job aid on accessing and responding to LAUSD solicitations in the system is attached to Section 00 2113 - Instructions to Bidders. If unsuccessful in uploading the file, a bidder should e-mail richard.stodomingo@lausd.net at least two (2) days prior to the Bid Due Date for assistance.

Sub-Bidding

Educational

$9,164,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

13

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Multiple Contract Summary, Work Sequence, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Project Coordination, Project Meetings, Construction Progress Documentation, Scheduling of Work, Construction Progress Schedule, Periodic Work Observation, Quality Requirements, Regulatory Requirements, Quality Assurance, Installer Qualifications, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Traffic Control, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Warranties, Project Record Documents, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Site Remediation, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Specialty Placed Concrete, Post-Tensioned Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Subflooring, Underlayment, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Roof and Deck Insulation, Steep Slope Roofing, Shingles and Shakes, Membrane Roofing, Roof and Wall Specialties and Accessories, Roof Accessories, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Specialty Doors and Frames, Coiling Doors and Grilles, Windows, Aluminum Windows, Roof Windows and Skylights, Metal-Framed Skylights, Ridge Metal-Framed Skylights, Glazing, Glass Glazing, Mirrors, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Wood Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Safety Specialties, Fire Protection Specialties
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Common Work Results for Fire Suppression, Meters and Gages for Fire-Suppression Systems
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Equipment, Domestic Water Filtration Equipment, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings, HVAC Fans, Air Outlets and Inlets
Division 27 - Communications

Division 27 - Communications

Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Storage Tanks
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Lifting Devices, Lifts, Slings, Manufacturing Equipment, Assembly and Testing Equipment, Applicators, Cutting Equipment, Mobile Plant Equipment, Trucks, Dump Trucks

Find More Local Projects

Within 75 Miles of This Project
251
Active Projects
134
Bidding Soon
2,096
All Active Projects
1,042
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 21, 2025

May 12, 2025

img_map_placeholder

7400 W Manchester Ave, Los Angeles, CA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Los Angeles Unified School District - Westchester Enriched Sciences Magnets Roofing Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.