BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 16, 2025 at 8:00 PM

Updated April 17, 2025

Site work and paving for a road / highway in Jackson, Tennessee. Completed plans call for site work for a road / highway; and for paving for a road / highway.

https://www.wbbjtv.com/2025/03/21/west-tennessee-road-construction-march-19-26/ West Tennessee Construction March 19-26, 2025 There will be possible DAYTIME or NIGHTTIME lane closures at various locations in Region 4 to make repairs or new installs on an as needed basis at various locations throughout the 21 counties. District 47 CARROLL COUNTY SR-76 (US-79): The grading, drainage, noise walls, signals and paving on U.S. 79 (S.R. 76) from near S.R. 77 to near Cutlip Lane will cause lane closures throughout the project. Meadowbrook Lane: On September 16, 2024, Meadowbrook Lane was closed. Big Buck Road: On November 11, 2024, Big Buck Rd. was closed. A detour will be provided. CARROLL COUNTY SR-22: The intersection improvements on SR 22 and Clyde Road at the Huntingdon Industrial Park entrance will cause lane closures throughout the project. SR-22: The intersection improvements on SR 22 and Lexington Street at the Huntingdon Industrial Park entrance serving Dynamix Casting Fluxes will cause lane closures throughout the project. DYER COUNTY SR-211: The bridge over the North Fork Forked Deer River (just south of Dyersburg) will have outside lane closures for inspection and evaluation beginning August 9, 2024. GIBSON/CARROLL COUNTY SR-76 (US-79): The grading, drainage, construction of a concrete box bridge, noise wall and paving on US 79 (SR 76) from west of Cades-Atwood Road in Gibson County to east of SR 77 in Carroll County will cause temporary lane closures throughout the project. SR-76(US-79)/SR77- The new four-lane section is open and final work on the project will continue under traffic with intermittent lane closures. TDOT advises all motorists to exercise caution as they adjust to new traffic patterns. HENRY COUNTY SR-218: The Resurfacing on SR218 from SR77 to SR76 will cause temporary lane closures throughout the project. OBION COUNTY SR22: The Resurfacing on SR22 from SR5 to SR21 including bridge joint expansion joint repair will cause temporary lane closures throughout the project. OBION COUNTY U.S. 51(SR3): The construction of turn lanes on U.S. 51 (S.R. 3) at Greenfield Drive/N. Morgan Street for State Industrial Access (SIA) support serving Williams Sausage HQ will cause an inside lane closure on U.S. 51(SR3) to thru traffic during construction. The cross-over at Greenfield Drive and N. Morgans Street will also be closed to thru traffic during construction. The Speed Limit is reduced from 50 mph to 40 mph on U.S. 51. OBION COUNTY U.S. 51(SR3), U.S. 45 (SR 5): Soil boring work will cause temporary lane closures on U.S 51 and U.S. 45 in South Fulton. This work will take place in the interchange of U.S. 51 and U.S. 45 and areas immediately adjacent to the interchange along these routes. District 48 DISTRICT 48 CRACK SEALING Various locations on various routes in Chester, Hardin, Madison, and Wayne County U.S. 45 BYP (S.R.186) Madison County: March 17, 2025, through March 26, 2025, PRI will begin crack sealing operations from Channing Way to Passmore Ln. Intermittent lane closures are projected throughout the week. CHESTER COUNTY U.S. 45 (SR 5): The repair of bridges on U.S. 45 over overflow, Turkey Creek, and Dry Creek are projected to begin lane closures on October 1, 2024, for southbound traffic. Northbound traffic lanes will remain unaffected throughout the project. CHESTER COUNTY SR100 between E. Main St. (LM 13.88) and Baker Rd. (LM 16.41) Crews are replacing 2 bridges on SR100 between E. Main St. and Baker Rd. Please use caution throughout the area. CROCKETT COUNTY SR221 at Thomas Rd. (LM 4.4) SR221 in Crockett County is closed at Thomas Rd. for crews to construct a new concrete box culvert. A detour is posted. HARDEMAN COUNTY S.R.15 (U.S. 64): The ADA curb ramp upgrades along S.R.15 from L.M. 9.23 to L.M. 18.65 will cause temporary lane closures in both directions. One lane will remain open at all times. HARDIN COUNTY SR128 over the Pickwick Dam: The bridge rehabilitation will cause temporary lane closures. One lane will remain open at all times. There is no lane width restriction at this time. HAYWOOD COUNTY I-40 East and Westbound MM 51.2- MM 48.6, at the Weigh Scales Sunday, March 16 through Saturday, March 22, 7PM-6AM: There will be east and westbound lane closures on I-40 in Haywood County between MM 51.2 and MM 48.6 at the Haywood County Weigh Scales. LOOK AHEAD: Sunday, March 23 through Saturday, March 29, 7PM-6AM: There will be lane closures both east and westbound on I-40 in Haywood County between MM 51.2 and MM 48.6 at the Haywood County Weigh Scales. Sunday, March 30 through Friday, March 4, 7PM-6AM: There will be lane closures both east and westbound on I-40 in Haywood County between MM 51.2 and MM 48.6, at the Haywood County Weigh Scales. HAYWOOD COUNTY SR222 from near proposed SR468 to near Camp Ground Rd. The reconstruction and widening of SR222 from near proposed SR468 to near Camp Ground Rd. will cause traffic disruption daily. Please use caution through the area. HENDERSON COUNTY (Non-TDOT Work) SR22 and US412 (SR20) Intersection in Lexington Saturday, March 29, 2025, through Saturday, April 12, 2025, 7:00 a.m.-4:00 p.m.: There will be rolling lane closures on US412 (SR20) in the right westbound lane from SR22 to N. Main St. And rolling lane closures on SR22 in the right north bound lane from Roberts St. To Hamlett St. This is for AT&T to remove overhead cable. Closures will not be every day. MADISON COUNTY I-40 AT S.R. 138 (EXIT 68): The interchange improvements on I-40 at S.R. 138 (Exit 68), including grading, drainage, and paving, will cause temporary lane closures in both directions. One lane will remain open at all times. Restrictions: The speed limit is reduced from 70 MPH to 60 MPH on I-40. Wednesday, March 19, through Wednesday, March 26, 7PM-6AM: There will be lane closures on I-40 Eastbound and Westbound for asphalt milling and paving operations. ALL WORK IS WEATHER DEPENDENT LOOK AHEAD: Wednesday, March 26, through Wednesday, April 2, 7PM-6AM: There will be lane closures on I 40 Eastbound and Westbound for barrier rail installation and pavement markings. ALL WORK IS WEATHER DEPENDENT MADISON COUNTY (REGION IV CONCRETE PAVEMENT REPAIR) I-40 MM 88-97 Eastbound Thursday, March 20, 7PM-6AM, Friday, March 21, 7PM through Saturday, March 22, 11:59PM: There will be lane closures on I-40 Eastbound from MM88- MM97 for concrete pavement repair. WEATHER DEPENDENT District 49 FAYETTE COUNTY SR-222, including the I-40 interchange (Exit 42): Grading, drainage, signals, and paving on SR 222 from Hebron Drive to near Thorpe Drive, including the I-40 interchange (Exit 42), will cause temporary lane closures in both directions. One lane will remain open at all times. Restrictions: The speed limit is reduced from 45 MPH to 40 MPH on SR 222. Sunday, March 23 through Tuesday, March 25, 8PM-4:30AM: There will be intermittent lane closures on I-40 eastbound in Fayette County from MM41-MM43 to move barrier in preparation for Phase II construction. ALL WORK IS WEATHER DEPENDENT FAYETTE COUNTY SR-76 from Lagrange Road to Kay Lane: The construction of SR 460 will have SR 76 reduced to one lane. Temporary traffic signals will be installed at Lagrange Road and Kay Lane. Kay Lane will be closed to through traffic during this phase of construction and will only be accessible from the southern end. SHELBY COUNTY SR-57 (E. Poplar Avenue) from Fletcher Road to I-269 (SR-385): There will be intermittent temporary lane closures along SR-57 for roadway widening activities. Flaggers will be present to direct traffic. At least one lane will remain open at all times. SHELBY COUNTY SR-14 (Jackson Avenue) Bridge over the CSX Railroad (L.M. 18.27): Friday, March 21st at 8pm, through Monday, March 24th: there will be temporary lane closures in both directions along SR-14 (Jackson Avenue) between National and Orchi Road to perform concrete repairs. At least one lane in each direction will remain open at all times. SHELBY COUNTY SR-4 from South of Shelby Drive to the Raines/Perkins Road interchange: The following routes will be affected due to roadway widening activities along SR-4. Affected Routes: Lamar Avenue (SR-4): Speed limit reduced from 55 mph to 45 mph from South of Shelby Drive to the Raines/Perkins Road interchange. Shelby Drive (SR-175): Speed limit reduced from 45 mph to 35 mph at the intersection with Lamar Avenue (SR-4). Pleasant Run Road: Closed to thru traffic from Pleasant Hill Road. Pleasant Run Road is closed from Lamar Avenue (SR-4). SHELBY COUNTY SR-175 (Shelby Drive) from SR-4 (Lamar Avenue) to Tuggle Road: Monday, March 24, 7:00 p.m.-6:00 a.m.: There will be intermittent temporary lane closures along Eastbound and Westbound SR-175 for roadway widening and utility relocation activities. At least one lane in each direction will remain open at all times. *March 25th and 26th will serve as backup dates. SHELBY COUNTY SR-14 from Kerrville Rosemark Road to the Tipton County Line: The widening on SR-14 (Austin Peay Hwy) from Kerrville-Rosemark to the Tipton County Line will cause shoulder closures and temporary lane closures in both directions. There will be intermittent lane closures daily on eastbound and westbound SR 14 to perform grading, drainage, and paving work. Tracy Rd, Mulberry Rd, and Gragg Rd. will be closed, and a detour put in place. SHELBY COUNTY SR385 From I-40 to SR 3 (U.S. 51) Wednesday, March 19th, through Wednesday, March 26th: 9:00 A.M. to 3:00 P.M.: There will be temporary lane closures on SR385 in both directions for pothole patching. One lane in each direction will remain open at all times. SHELBY COUNTY I-240 at Exit 23 (Airways Blvd.): through March 30th, 2025: There will be no temporary lane closures along Airways Blvd. and Ketchum Rd. to perform safety improvements. All lanes in each direction will remain open at all times. Shelby County SR 1 (U.S. 51) Danny Thomas Blvd from Poplar Ave. to Jackson Avenue, March 19th, through March 30th, 2025, 9:00 a.m. – 3:00 p.m.: There will be temporary lane closures for ADA ramp construction and Traffic Signal installations. SHELBY COUNTY I-40 Hernando DeSoto Bridge over the Mississippi River Restrictions: The speed limit is reduced to 45 MPH through the work zone along I-40 Westbound. Wednesday, March 19 through Friday, March 21 at 6:00 p.m.: There will be a single right lane closure along I-40 Westbound and I-40 Eastbound on the Hernando de Soto Bridge for repair activities. At least one lane in each direction will remain open at all times. Wednesday, March 19 and Thursday, March 20, 8:00 p.m.-6:00 a.m.: There will be a double right lane temporary lane closure along I-40 Westbound on the Hernando de Soto Bridge for repair activities. At least one lane will remain open at all times. The Jackson Avenue and Riverside Drive on ramps to I-40 Westbound will both be closed during this time. Detours will be posted. Wednesday, March 19 and Thursday, March 20, 9:00 p.m.-6:00 a.m.: There will be a double right lane temporary lane closure along I-40 Eastbound on the Hernando de Soto Bridge for repair activities. At least one lane will remain open at all times. Monday, March 24 at 6:00 a.m. through Wednesday, March 26: There will be a single right lane closure along I-40 Westbound and I-40 Eastbound on the Hernando de Soto Bridge for repair activities. At least one lane in each direction will remain open at all times. Monday, March 24 through Wednesday, March 26, 8:00 p.m.-6:00 a.m.: There will be a double right lane temporary lane closure along I-40 Westbound on the Hernando de Soto Bridge for repair activities. At least one lane will remain open at all times. The Jackson Avenue and Riverside Drive on ramps to I-40 Westbound will both be closed during this time. Detours will be posted. Monday, March 24 through Wednesday, March 26, 9:00 p.m.-6:00 a.m.: There will be a double right lane temporary lane closure along I-40 Eastbound on the Hernando de Soto Bridge for repair activities. At least one lane will remain open at all times. SHELBY COUNTY I-55 Interchange at E. H. Crump Blvd.: The modification of the I-55 interchange at E. H. Crump Blvd. is currently under construction and will result in intermittent temporary lane closures and detours along I-55 as necessary from East-North Service Rd. in Arkansas to South Parkway in Tennessee. Restrictions: North and Southbound I-55 are restricted to 11’ lane widths with necessary detours posted. Speed limits are reduced to 45 MPH through the work zone. Traffic Pattern: The I-55 Southbound inside lane will be closed, starting at East-North Service Rd. in Arkansas, West of the Memphis-Arkansas Bridge. Single lane Southbound traffic will continue through the active work zone until crossing the McLemore Bridge and on-ramp to I-55 Southbound. From there, normal traffic patterns for I-55 Southbound will resume. The I-55 Northbound inside lane will be closed, starting at the South Parkway on-ramp to I-55. Single lane Northbound traffic will continue through the active work zone until crossing the Memphis Arkansas Bridge. From there, normal traffic patterns for I-55 Northbound will resume. Affected Routes: I-55 Northbound and Southbound: Reduced to single lane in each direction though the project limits. E. H. Crump Boulevard: Closed from Kentucky St. to Metal Museum Dr. • Riverside Drive: Closed from E. H. Crump Blvd. / I-55 interchange to W. Carolina Ave. • Channel 3 Drive: On-Ramp to Riverside Dr. Closed. East-North Service Road: On-Ramp to I-55 Southbound Closed. Friday, March 21 at 8:00 p.m. through Monday, March 24 at 6:00 a.m.: The Tennessee Department of Transportation contract crews will be closing the I-55 Mississippi River Bridge to continue construction activities on the I-55 and Crump interchange. Activities include Bridge repair and Bridge Inspection on I-55 (Memphis Arkansas Bridge). I-55 SB will be closed at Bridgeport Road in Arkansas I-55 NB will be closed at South Parkway* in Tennessee *Local traffic will be allowed to continue to the McLemore exit I-55 SB ramp will be closed. Crump Boulevard WB will be closed** A detour will be posted. SHELBY COUNTY I-240, I-55, and I-40 from 8 PM to 5 AM: Replacement of Digital Message Signs will cause rolling roadblocks at the following locations. Date County Route MM to MM 03/19/25 SHELBY I-40 W 10.00 7.00 03/19/25 SHELBY I-40 W 12.00 9.00 03/20/25 SHELBY I-240 W 14.50 18.00 03/20/25 SHELBY I-240 E 22.00 19.00 03/24/25 SHELBY I-55 S 4.00 1.00 03/24/25 SHELBY I-55 N 4.30 7.30 03/25/25 SHELBY I-55 S 12.00 9.00 03/25/25 SHELBY I-40 E 1.00 4.00 03/26/25 SHELBY I-40 W 4.00 1.00 TIPTON COUNTY US-51 (SR-3) at the intersection of Kenwood Avenue: There will be temporary inside and outside lane closures on north and southbound US 51 at Kenwood Avenue DAILY to allow for safety improvements. At least one lane in each direction will be open at all times. NON-TDOT WORK SHELBY COUNTY SR-177 (Germantown Road) from Brierbrook to the Wolf River: There will be long term lane closures going north and southbound SR 177 to perform widening and intersection improvements. Additional lane closures will be active on Wolf River Blvd. at the intersection with SR-177 (Germantown Rd.). From your desktop or mobile device, get the latest construction activity and live-streaming SmartWay traffic cameras at www.TNSmartWay.com/Traffic. Travelers can also dial 511 for travel information, or follow us on Twitter at https://twitter.com/myTDOT for statewide travel or West Tennessee follow https://twitter.com/NicLawrenceTDOT. As always, drivers are reminded to use all motorist information tools wisely and Know Before You Go! by checking travel conditions before leaving for your destination. Drivers should never tweet, text, or talk on a cell phone while behind the wheel. ----------------------------------------------------------------------------------------------- Project No. NH-I-40-1(374), 57I040-F8-007 (PIN 132475.00), 57I040-M3-006 (PIN 132475.00) The resurfacing on I-40 from near Lower Brownsville Road (L.M. 7.10) to the South Fork Forked Deer River (L.M. 11.06), including thin epoxy overlay. Project Length - 3.960 miles Completion Time - On or before 10/31/2025 (See Special Provision 108B) The DBE goal for this contract is 7%. Each bid must be accompanied by an electronic bid bond or a Cashier's or Certified Check made payable to the Department of Transportation, or Irrevocable Letter of Credit naming the Department as beneficiary (for Mowing and Litter projects only), in an amount equaling not less than five percent (5%) of the amount bid. All questions related to the Proposal Contract, Plans, Specifications or Special Provisions shall be directed to the Headquarters Construction Office (615-741-2414). Information received from other offices of the Tennessee Department of Transportation is strictly advisory. A Prime Contractor must prequalify with The Department of Transportation in accordance with Tennessee Code Annotated 54-5-117 and Tennessee Department of Transportation Rule 1680-5-3, Prequalification of Contractors, before bid authorization for highway contracts will be furnished. Prime contractors, except mowing and litter removal contractors, are required to be licensed with the State of Tennessee, Department of Commerce and Insurance (TDCI), Board for Licensing Contractors (BLC). Prime contractors must be licensed in the general classification (e.g. Heavy Construction (HC), Highway, Railroad, Airport Construction (HRA), Specialty (S), Municipal and Utility Construction (MU), or Electrical Contracting (CE)) for the type of work in the project which they will perform. Bidders may submit a Proposal without having a license and will be considered for award for twenty-one (21) days after Proposals are opened. If the Bidder does not have a license with the TDCI, on or before twentyone (21) days after Proposals are opened, the Bidder will be considered non-responsive and their Proposal will be rejected. The Department encourages the use of disadvantaged business enterprises on all contracts TNDOT - 028 - Resurfacing on I-40

Award

Roads / Highways

$4,710,307.00

Public - State/Provincial

Paving, Site Work

28

5

4

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
98
Active Projects
64
Bidding Soon
598
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 21, 2025

May 20, 2025

Project location map

I-40, Jackson, TN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.