BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 19, 2025 at 8:00 PM

Updated March 20, 2025

Site work and paving for a mixed-use development in Minneapolis, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

CP 4630001SAP 027-601-409; 027-608-015; 027-609-044; 027-615-026; 027-627-007; 027-652-047; 027-628-008; 027-642-005; 027-646-011; 027-673-012; 027-710-013; 027-752-044; 027-752-045; 027-604-019; 027-606-022; 027-614-017; 027-615-027; 027-644-011; 027-661-059 Location: CSAH 1, 4, 6, 8, 9, 14, 15, 27, 28, 42, 44, 46, 52, 61, 73, 110, and 152 in the Cities of Bloomington, Brooklyn Center, Crystal, Eden Prairie, Maple Grove, Minneapolis, Minnetonka, Minnetrista, Mound, New Hope, Orono, Plymouth and Spring Park. The major items of work are approximately: 1 Lump Sum Mobilization Area 1; 1 Lump Sum Mobilization Area 2; 1 Lump Sum Mobilization Area 3; 1 Lump Sum Mobilization Area 4; 1 Lump Sum Mobilization Area 5; 1 Lump Sum Mobilization Area 6; 1 Lump Sum Mobilization Area 7; 1 Lump Sum Mobilization Area 8; 1 Lump Sum Mobilization Area 9; 1 Lump Sum Mobilization Area 10; 1 Lump Sum Mobilization Area 11; 1 Lump Sum Mobilization Area 12; 1 Lump Sum Mobilization Area a; 1 Lump Sum Mobilization Area B; 1 Lump Sum Mobilization Area C; 1 Lump Sum Mobilization Area D; 319661.5 Lin Ft Pavement Marking Removal; 17017.66 Sq Ft Pavement Marking Removal; 10 Each Remove Casting; 118 Each Remove Sign Type C; 50 Each Salvage Sign Type C; 354 Lin Ft Remove Curb and Gutter; 4124 Lin Ft Remove Bituminous Curb; 14 Sq Yd Remove Concrete Walk; 285 Sq Yd Remove Pavement; 781 Sq Ft Remove Concrete Driveway Pavement; 61 Cu Yd Excavation - Common; 934 Ton Aggregate Surfacing Class 2; 16 Hour Street Sweeper (With Pickup Broom); 8 M Gallon Water; 45 Ton Aggregate Base Class 5; 302 Ton Bituminous Patching Mixture; 62 Ton Bituminous Patching Mixture (Special); 1197 Ton Bituminous Patching Mixture (for Milled Joints); 6289 Sq Yd Mill Bituminous Surface (1.5"); 376436 Sq Yd Mill Bituminous Surface (2.0"); 71707 Sq Yd Mill Bituminous Surface (3.0"); 17766 Lin Ft Mill Concrete Pavement for Joint Repair; 1838 Lin Ft Mill Concrete Gutter; 36872 Gallon Bituminous Material for Fog Seal; 451772 Sq Yd Bituminous Seal Coat; 149085 Gallon Bituminous Material for Seal Coat; 56762 Ton Type Sp 9.5 Wearing Course Mixture (3;b); 83 Each Adjust Valve Box (Special); 10 Each Install Casting; 7 Each Adjust Frame and Ring Casting; 507 Each Adjust Casting Special a; 66 Each Adjust Casting Special B; 714 Sq Ft 4" Concrete Walk; 144 Sq Ft 4" Bituminous Walk; 3 Each Concrete Median Nose-special; 1007 Lin Ft Concrete Curb and Gutter; 3436 Lin Ft Bituminous Curb; 1 Lump Sum Traffic Control Area 1; 1 Lump Sum Traffic Control Area 2; 1 Lump Sum Traffic Control Area 3; 1 Lump Sum Traffic Control Area 4; 1 Lump Sum Traffic Control Area 5; 1 Lump Sum Traffic Control Area 6; 1 Lump Sum Traffic Control Area 7; 1 Lump Sum Traffic Control Area 8; 1 Lump Sum Traffic Control Area 9; 1 Lump Sum Traffic Control Area 10; 1 Lump Sum Traffic Control Area 11; 1 Lump Sum Traffic Control Area 12; 1 Lump Sum Traffic Control Area a; 1 Lump Sum Traffic Control Area B; 1 Lump Sum Traffic Control Area C; 1 Lump Sum Traffic Control Area D; 1 Lump Sum Traffic Control Supervisor 1; 1945 Hour Flagger; 414 Unit Day Portable Changeable Message Sign; 10 Sq Ft Construction Sign-special; 50 Each Install Sign Type C; 1025.41 Sq Ft Sign Panels Type C; 4 Each Rigid Pvc Loop Detector 6'x6'; 675 Each Storm Drain Inlet Protection; 10 Lin Ft Sediment Control Log Type Rock; 173 Cu Yd Common Topsoil Borrow; 1 Lump Sum Turf Establishment; 1 Lump Sum Interim Pavement Marking; 1 Lump Sum Temporary Pavement Marking; 521965 Lin Ft Mobile Retroreflectometer Measurements; 490 Lin Ft 4" Solid Line Paint; 224 Lin Ft 6" Solid Line Paint; 120 Lin Ft 4" Broken Line Paint; 100 Lin Ft 6" Broken Line Paint; 30 Lin Ft 6" Dotted Line Paint; 127 Lin Ft 4" Double Solid Line Paint; 3139 Lin Ft 6" Solid Line Multi-component; 190 Lin Ft 6" Broken Line Multi-component; 152 Lin Ft 6" Dotted Line Multi-component; 1092 Lin Ft 4" Double Solid Line Multi-component; 42841 Lin Ft 4" Solid Line Multi-component Ground in; 315446 Lin Ft 6" Solid Line Multi-component Ground in; 6611 Lin Ft 8" Solid Line Multi-component Ground in; 11330 Lin Ft 4" Broken Line Multi-component Ground in; 9910 Lin Ft 6" Broken Line Multi Comp Gr in; 8676 Lin Ft 6" Dotted Line Multi Comp Gr in; 1296 Lin Ft 8" Dotted Line Multi-component Ground in; 116553 Lin Ft 4" Double Solid Line Multi-component Ground in; 4483 Lin Ft 24" Solid Line Preform Thermo Ground in; 246 Lin Ft 6" Dotted Line Preform Thermo Ground in; 2596 Lin Ft 24" Solid Line Preform Thermo Ground in Esr; 9142 Sq Ft Pavement Message Preform Thermoplastic Ground in Enhanced Skid Resistance; 24330 Sq Ft Crosswalk Preform Thermoplastic Ground in Enhanced Skid Resistance; 210 Sq Ft Pavement Marking Special; 304 Sq Ft Pavement Marking Special 2; 1 Lump Sum Mobilization Area E; 52783 Lin Ft Pavement Marking Removal; 32 Sq Ft Pavement Marking Removal; 1 Hour Street Sweeper (With Pickup Broom); 3745 Gallon Bituminous Material for Fog Seal; 374501 Lump Sum Mobilization Area 13; 406 Lin Ft Remove Curb and Gutter; 776 Sq Yd Remove Concrete Walk; 90 Sq Yd Remove Pavement; 1 Hour Street Sweeper (With Pickup Broom); 1 M Gallon Water; 10 Cu Yd Aggregate Base (Cv) Class 5; 5 Ton Bituminous Patching Mixture; 5 Ton Bituminous Patching Mixture (Special); 68029 Sq Yd Mill Bituminous Surface (2.0"); 7918 Ton Type Sp 9.5 Wearing Course Mixture (3;b); 19 Each Adjust Valve Box (Special); 13 Each Adjust Frame and Ring Casting; 8 Each Adjust Casting Special a; 1 Each Adjust Casting Special B; 776 Sq Ft 4" Concrete Walk; 406 Lin Ft Concrete Curb and Gutter; 1 Lump Sum Traffic Control Area 13; 1 Lump Sum Traffic Control Supervisor 3; 200 Hour Flagger; 20 Unit Day Portable Changeable Message Sign; 10 Sq Ft Construction Sign-special; 104 Each Storm Drain Inlet Protection; 15 Cu Yd Common Topsoil Borrow; 1 Lump Sum Turf Establishment; 1 Lump Sum Interim Pavement Marking; 18650 Lin Ft Mobile Retroreflectometer Measurements; 4820 Lin Ft 4" Solid Line Multi-component Ground in; 4398 Lin Ft 6" Solid Line Multi-component Ground in; 1470 Lin Ft 8" Solid Line Multi-component Ground in; 1200 Lin Ft 4" Broken Line Multi-component Ground in; 4240 Lin Ft 6" Broken Line Multi Comp Gr in; 830 Lin Ft 6" Dotted Line Multi Comp Gr in; 250 Lin Ft 8" Dotted Line Multi-component Ground in; 1442 Lin Ft 4" Double Solid Line Multi-component Ground in; 128 Lin Ft 24" Solid Line Preform Thermo Ground in; 912 Sq Ft Pavement Message Preform Thermoplastic Ground in Enhanced Skid Resistance; 3800 Sq Ft Crosswalk Preform Thermoplastic Ground in Enhanced Skid Resistance; Sq Yd Bituminous Seal Coat; 12359 Gallon Bituminous Material for Seal Coat; 1 Lump Sum Traffic Control Area E; 1 Lump Sum Traffic Control Supervisor 2; 13 Unit Day Portable Changeable Message Sign; 21 Each Storm Drain Inlet Protection; 1 Lump Sum Interim Pavement Marking; 1 Lump Sum Temporary Pavement Marking; 31718 Lin Ft Mobile Retroreflectometer Measurements; 21327 Lin Ft 6" Solid Line Multi-component Ground in; 10391 Lin Ft 4" Double Solid Line Multi-component Ground in; 15 Lin Ft 24" Solid Line Preform Thermo Ground in Esr; all in accordance with specifications and bid forms. Direct questions about this Project, including pre-bid questions, to Eric Drager at Eric.Drager@hennepin.us.

Bid Results

Roads / Highways

$10,344,554.00

Public - County

Paving, Site Work

382

10

4

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
283
Active Projects
149
Bidding Soon
1,496
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2025

June 9, 2025

Project location map

Multiple Locations, Minneapolis, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.