EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 5, 2025 at 7:00 PM

Updated October 1, 2024

Site work for a playground / park / athletic field in Bloomington, Indiana. Completed plans call for site work for a playground / park / athletic field.

2025 Tree Canopy Replacement and Expansion Project The Contractor shall provide all materials, labor, and equipment necessary to complete the following described project: This project, titled '2025 Tree Canopy Replacement and Expansion Project,' shall include, but is not limited to, tree planting along various public right-of-ways and parks throughout Bloomington, IN. All work shall meet the City of Bloomington's requirements. The bid and other data submitted will form the basis of an agreement for the work. Each Bidder shall file with his or her sealed bid: (1) A cashier's check or certified check drawn on an acceptable bank or a Bid bond equal to five (5) percent of the total amount of bid (2) An Affirmative Action Plan or a current approval letter from the City of Bloomington Contract Compliance officer (3) Completed and signed Bid Form (4) Completed and notarized NonCollusion Affidavit (5) Completed and notarized E-Verify Affidavit For bids of $100,000.00 or more, the successful bidder shall be required to furnish a performance bond and payment bond for one hundred percent (100%) of the contract amount prior to the execution of the contract, and said bonds shall remain in effect for a period of one (1) year after final acceptance of the work. Each Vendor/Contractor submitting a quote, proposal or bid over $10,000.00 shall submit their Affirmative Action Plan prior to or by the submission deadline for requests. The Affirmative Action plan must make a good-faith effort to comply with the City's requirements. It is strongly advised to contact Audrey Brittingham, Contract Compliance Officer, at (812) 349-3426 at least 24 hours before proposals are due to ensure that your affirmative action plan complies with the City's requirements. The Board of Park Commissioners reserves the right to waive any informalities and to accept or reject any or all bids submitted. Bids may be held by the Board of Park Commissioners for a period not-to-exceed sixty (60) days, from the date of the opening of Bids for the purpose of reviewing the Bids and investigating the qualifications of the Bidders prior to awarding the contract. Tree Planting instructions as follows for Tree Lawn or Right of Way Tree Planting a. Inspect the tree - Contractor shall carefully remove the soil at the top of the container or root ball tolocatethetrunk flare. Check for girdling roots and damage to the root system and lower trunk. Only trees of acceptablequality are to be used for planting. b. Site prep- Stump removal or old root ball removal may be necessary c. Dig the hole - The hole may be a minimum of 1.5 times the diameter of the container or rootball diameter. Thecenter of the planting hole must be excavated to the depth of the bottom of the rootball to the trunk flare. Digthehole and leave an undisturbed "pedestal" in the center to allow for future soil settling. Any site withundergroundutilities within 3 feet shall be hand dug, or use of equipment such as a vacuum truck is also acceptable. If utilizingavertical auger for digging site, the Contractor must backfill the hole and tamp the soil, as necessary, toestablishanappropriate planting depth. d. Rootball preparation - Loosen and straighten outside and bottom roots prior to placing the rootball inthehole. The rootball may be up to 1 inch above or below ground level. Winding and girdling roots shall be prunedtoeitherthe point they are perpendicular to the rootball, or a point where they can be straightened and placedperpendicular to the rootball. Remove burlap and twine from top of rootball, remove any synthetic material. Keepthe roots moist during this process. e. Backfill -After tree placement, backfill the hole with the soil removed from the site, holding the trunk andcentralleader to ensure a straight upright position. Fill the entire hole level with existing soil grade. Root flareshall bewithin one inch of existing surrounding soil grade. If any soil is remaining, such as a soil ring around thetreefromauguring, this is to be removed. In the event that the soil removed is not enough to fill hole to surroundinggrade,contractor shall remediate issue by the addition of loam soil, or high organic content soil. f. Protection - All trees shall receive some form of rigid plastic mesh to protect from the local deer population. g. Staking - Remove the nursery stake and any associated ties, twine or tags from the tree, if present. Install twostakes in an east to west pattern, at least 2 feet into the native soil outside the rootball. One tie per stakemustbeplaced at the lowest point on the trunk where the tree crown stands upright. Ties must be loose enoughsothetree can move in the wind, but taut enough that the tree does not rub the stakes during movement. h. Mulch - Apply 2-4 inches deep of bark mulch or other organic mulch over the planting hole, remaining at least4inches away from the trunk flare. i. Watering - After planting and staking the tree, apply water using a lower pressure application for a timelongenough to saturate the rootball and planting area. Install a watering bag, such as a TreeGator to all trees planted.Contractor is only responsible for the first watering and watering bag installation. Locations- 700 S Walnut ST Front S Walnut ST 52488 Redmond Linden District12700 S Pinehurst DR Side W Pine Meadows DR 33036 Sentry Linden District11109 W Pine Meadows DR Front W Pine Meadows DR 33056 Green Gable BlackgumDistrict12703 S Pinehurst DR Side S Pine Meadows DR 33063 Ky Coffee Tree District11117 W Pine Meadows DR Front W Pine Meadows DR 33067 American HornbeamDistrict11129 W Pine Meadows DR Front W Pine Meadows DR 33076 American HornbeamDistrict12637 S Isabel CT Front S Isabel CT 33078 Tulip District12637 S Isabel CT Front S Isabel CT 53090 Tulip District12637 S Isabel CT Front S Isabel CT 53091 Scarlet Oak District11108 W Pine Meadows DR Front W Pine Meadows DR 33124 Red Oak District12701 S Pine Meadows DR Front S Pine Meadows DR 33129 Green Gable BlackgumDistrict12709 S Pine Meadows DR Front S Pine Meadows DR 33168 Hackberry District12607 S Southern Pines CT Front S Southern Pines CT 33273 Shumard Oak District11446 S Basswood CIR Side S Basswood DR 48509 Hackberry District1401 S Parkway DR Front S Parkway DR 35215 River Birch District1401 S Parkway DR Front S Parkway DR 35220 Sentry Linden District1401 S Parkway DR Side W Belle AVE 35250 Hackberry District1408 S Harvey DR Side W Belle AVE 35259 Hackberry District1408 S Harvey DR Side W Belle AVE 35270 Apollo Maple District1750 S Westwood DR Front S Westwood DR 35398 Green Gable BlackgumDistrict1810 S Westwood DR Front S Westwood DR 35407 Northern Splendor BlackgumDistrict1801 S Westwood DR Front S Westwood DR 35427 Sentry Linden District12307 S Cutter CT Front S Cutter CT 35458 Yellowwood District14425 W Middle CT Front W Middle CT 35561 Snowcloud Serviceberry District1751 S Parkway DR Front S Parkway DR 35579 Yellowwood District1 721 S Parkway DR Front S Parkway DR 35590 White Oak District1741 S Parkway DR Front S Parkway DR 35600 Swamp White Oak District1701 S Parkway DR Front S Parkway DR 35610 Tulip District1511 S Parkway DR Front S Parkway DR 35626 Tulip District1401 S Parkway DR Front S Parkway DR 35633 Sentry Linden District1421 S Wynnedale DR Side S Owens DR 36325 Redbud District1421 S Wynnedale DR Side S Owens DR 36329 Snowcloud Serviceberry District1606 S College AVE Front S College AVE 37926 Hackberry District1606 S College AVE Front S College AVE 37931 Hackberry District1620 W Dixie ST Side S Fairview ST 38859 Valley Forge ElmDistrict1620 W Dixie ST Side S Fairview ST 38869 Shingle Oak District12350 W Bloomfield RD Front W Bloomfield RD 47624 Ky Coffee Tree District12350 W Bloomfield RD Front W Bloomfield RD 47620 Redmond Linden District12350 W Bloomfield RD Front W Bloomfield RD 47617 Hackberry District12350 W Bloomfield RD Front W Bloomfield RD 47610 Valley Forge ElmDistrict12350 W Bloomfield RD Front W Bloomfield RD 47599 Redmond Linden District12350 W Bloomfield RD Front W Bloomfield RD 47590 Valley Forge ElmDistrict1320 W Country Club DR Front W Country Club DR 46199 Ky Coffee Tree District1704 W Graham DR Side S Ford AVE 46046 White Oak District12429 S Broadview DR Front S Broadview DR 46003 Sentry Linden District12429 S Broadview DR Front S Broadview DR 45994 Northern Splendor BlackgumDistrict12430 S Brown AVE Front S Brown AVE 45974 Chinkapin oak District12430 S Brown AVE Front S Brown AVE 45944 Northern Splendor BlackgumDistrict14611 W Belle AVE Front W Belle AVE 44319 Thornless Hawthorn District14611 W Belle AVE Front W Belle AVE 44313 White Oak District14611 W Belle AVE Front W Belle AVE 44305 Shingle Oak District1 All work must be completed by December 31st, 2025 Question Deadline 02/28/2025 Questions due via email

Post-Bid

Playgrounds / Parks / Athletic Fields

$553,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
99
Active Projects
48
Bidding Soon
936
All Active Projects
394
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2025

April 4, 2025

img_map_placeholder

Multiple Locations, Bloomington, IN

Related To This Project


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

2025 Tree Canopy Replacement and Expansion Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.