Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 19, 2025 at 8:00 PM
Updated August 19, 2025
Site work and paving for a mixed-use development in Lutz, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; sidewalk / parking lot; and sidewalk / parking lot.
Counties: Pasco Road Name: SR 45 (US 41) and SR 54 Limits: From Gator Ln to Sabal Palm Ct and From E of Bexley Village Dr to W of Crestbend Blvd Project(s): 45097015201(*) Federal Aid No: D725009B Total Roadway Length: 0.846 Miles Total Bridge Length: 0.000 Miles Total Proposal Length: 0.846 Miles Contract Days: 90 Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 45 Days Please read the full advertisement Solicitation : CT250326 Description: The Improvements under this Contract consist of the addition of 6 ft sidewalks from the west side of SR 45 (US 41) from Gator Ln to Sabal Palm Ct, 5 ft sidewalk from the northside of SR 54 from east of Bexley Village Dr. to west of Crestbend Blvd, new concrete driveways, drainage improvements including side drain replacement and ditch regrading, and the addition of pavement marking crosswalks and stop bars, as well as the installation of new signs in Pasco County. Prequalification per Rule 14-22 is not required. Proposal Guaranty of $500 is required for bids over $150,000 and may be in the form of a Cashiers Check, the BDI Bid or Proposal Bond (Form No. 375-020-16), or the standard Bid or Proposal Bond form, Form No. 375-020-09). Question Deadline 03/19/2025 at 5:00 PM ET, Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 025 - Sidewalk - SR 45 and SR 54
Award
Roads / Highways
$643,597.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 26, 2025
April 2, 2025
FL-54 & FL-45, Lutz, FL
Related To This Project
Lutz, FL
Bid Date: Mar 26 2025
Lutz, FL
Bid Date: Apr 14 2025
Lutz, FL
Bid Date: May 23 2025
Lutz, FL
Bid Date: Jun 01 2025
Lutz, FL
Bid Date: Jun 13 2025
Lutz, FL
Bid Date: Jun 03 2025
Lutz, FL
Bid Date: Jul 29 2025
Lutz, FL
--
Lutz, FL
Bid Date: Feb 05 2025
Lutz, FL
--
Lutz, FL
Bid Date: Feb 10 2025
Lutz, FL
Bid Date: Oct 15 2020
Lutz, FL
Bid Date: Jan 08 2025
Lutz, FL
Bid Date: Jan 17 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
