Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 25, 2025 at 8:00 PM
Updated April 26, 2025
Renovation of an educational facility in Evansville, Indiana. Completed plans call for the renovation of a educational facility.
Bosse High School First Floor Corridor Flooring Renovations Project Any bid that exceeds a sum of $5,000.00 must be accompanied by a Contractor's Financial Statement attached to the General Form 96 as prescribed by the State Board of Accounts. One General Form No. 96 will be required from any one contractor for one or more bids. All proposals shall be firm without escalator clauses. The proposal must be accompanied by a certified check made payable to EVSC in an amount equal to not less than five percent (5%) of the base bid or an acceptable bidder's surety bond made payable to EVSC, in a SPECIFIC AMOUNT of not less than five percent (5%) of the base bid, executed by a surety company authorized to do business in the State of Indiana. The certified check or bidder's bond shall be a guarantee that said bidder will, if the contract is awarded to him, execute within ten (10) days from the acceptance of his proposal a contract for the work bid upon, and furnish acceptable surety bonds as set forth in the specifications. However, if the contractor has not executed the contract within the ten (10) day period, or has failed to furnish acceptable surety bonds as indicated, the Board of School Trustees reserves the right to award the contract to the next higher or best bidder. All local licensing requirements must be met prior to submitting bid (Building Commissioner #812-436-7867). Inclusion of drug policy is mandatory with quotation. All persons intending to submit a bid with EVSC must comply with MBE/WBE utilization and E-Verify policies and procedures as outlined in the specifications. No bidder may withdraw his bid for a period of ninety (90) days after the date set for the opening of bids. The Board of School Trustees of the Evansville Vanderburgh School Corporation reserves the right to reject any and all bids and to waive any defects or informalities if deemed by it to be for the best interest of said Board.
Award
Educational
$172,400.00
Public - City
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 4, 2025
April 3, 2025
1300 Washington Ave, Evansville, IN
Related To This Project
Evansville, IN
Bid Date: Mar 10 2025
Evansville, IN
Bid Date: Mar 11 2025
Evansville, IN
--
Evansville, IN
Bid Date: Apr 08 2025
Evansville, IN
--
Evansville, IN
Bid Date: Apr 02 2025
Evansville, IN
Bid Date: Apr 01 2025
Evansville, IN
Bid Date: Apr 15 2025
Evansville, IN
Bid Date: Mar 25 2025
Evansville, IN
Bid Date: Feb 26 2025
Evansville, IN
Bid Date: Mar 06 2025
Evansville, IN
Bid Date: Feb 14 2025
Evansville, IN
Bid Date: Feb 12 2025
Evansville, IN
Bid Date: Feb 05 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
